Technology Blogs by Members
Explore a vibrant mix of technical expertise, industry insights, and tech buzz in member blogs covering SAP products, technology, and events. Get in the mix!
cancel
Showing results for 
Search instead for 
Did you mean: 
Former Member
0 Kudos

BRF+ Transports fails with errors then BRF+ application inactive in target system.

Issue Explanation: When we import BRF+ application using transport from Dev system to SIT/UAT/Prod if transports imported with return code 12/8 then in target system that BRF+ application will be in active.

Then we have two options to fix issue

1. Using FDT_HELPERS tcode we can re import failed transports then it will activated BRF+ application in SIT/UAT/prod

Or

2. Create new transport with BRF+ application and import to target system if new transport import successful into target system then it will activate BRF+ application in Target system.


Here I am covering first option next blog I will cover second option

Step 1:

Please prepare transport before release

Step 2:

Then Release Transport in Source system

Step 3:

Please inform Basis to run import job to target system

Step 4:

Check transport import log

Tcode: SE01

Provide your transport and click on Log Tab

Step 5:

Transport fails with return error code 8

Step 6:

Open BRFPLUS workbench and check BRF+ application it will be inactive mode in target system

Step 6:

Login into target system and Open FDT_HELPERS tcode in target system

Step 7:

Expand BRFplus -  Transport

Step 8:

Select BRFplus: Transport phase Execution

Step 9:

Click on Execute

Step 10:

Next you will see below screen

Step 11:

Provide your transport like below and select radio button After import Processing then click on Execute button

Step 12:

It will show you result is successfully generated BRF+ application in target system

9 Comments
Labels in this area