Technology Blogs by Members
Explore a vibrant mix of technical expertise, industry insights, and tech buzz in member blogs covering SAP products, technology, and events. Get in the mix!
cancel
Showing results for 
Search instead for 
Did you mean: 
TammyPowlas
Active Contributor

This was an ASUG webcast today with SAP's David Stocker.  Part 1 is Analysis Office on HANA Scenarios - ASUG Webcast

The usual SAP legal disclaimer applies that things in the future are subject to change

New roadmaps are coming at Las Vegas SAP TechEd && d-code

Figure 1: Source: SAP

Design and runtime enhancements include navigation panel, enhanced scripting, customize crosstabs, Excel-based printing and exporting, enhanced set of components, BEx Query Exceptions support, background query loading, and enhanced charting and visualization

With partner and customer SDK, you create custom charts, visualizations and extensions (e.g. commentary)

Additional data sources supported include relational .UNX support with .UNX query panel

Coming in Design Studio 1.4 is RRI, drag and drop and more shown in the middle of Figure 1

Figure 2: Source: SAP

Most Design Studio customers use are using BI platform.

When deploy using HANA, no BICS is involved; instead it is pushing off to Information Access Service (aka INA)

SAP does not recommend HANA native deployment yet as it is still new, young, INA is new

It refreshes on backend on data sources can be parallel

Figure 3: Source: SAP

Missing: Calculated Measures and Exceptions

Figure 4: Source: SAP

Figure 4 covers expected limitations with Design Studio 1.4 HANA deployment.

There is no Variable Value help in 1.4.  It should be present in 1.5

Export means export to Excel/CSV

Question & Answer

Q:  Is Design Studio still on track to be able to use RSBBS jump functionality is the near or far future? (right mouse click, context menu, go to...)

A:  1.4 - enabling context menu - a component - add to document, define jump targets in BIP/BW

________________________________________________________________

Q:  BW Workspaces, Is there any schedule/planning to support non cumulative key figures and IP cubes?

A:  At moment no, space is open

________________________________________________________________

Q:  How does the security work?

A:  It uses the related BW or HANA backend security

________________________________________________________________

Q:  Design Studio or Analysis Office, Is there any considerable report performance growth with HANA ? any used cases with/without HANA !

A:  For Design Studio, he pointed out parallel executiion of queries on HANA

________________________________________________________________

Q:  is Table Design going to be only on Native HANA or would it also be available on SAP BW?

A:  Table Design will be available on Analysis 2.0 against BW (some prerequisites apply)

________________________________________________________________

Q:  Analysis on office via BICS is limited to the safety belt or cell restriction . Via UNX its not . Will the BICS safety belt be removed for analysis for office. Also will the COM add in restriction be removed .

A:  remove with registry setting

________________________________________________________________

Q:  Is bursting possible from analysis office on native HANA?

A:  No, this is not possible

________________________________________________________________

Q:  Do we have any plan integrating Analysis MS Office with Informatica ILM (Information Lifecycle Management) which is Archive DB.

A:  no

________________________________________________________________

Q:  Web Application Designer is able to publish to Portal.  Will Design Studio ever do this?

A:  Design Studio has an iview for the portal today

________________________________________________________________

Q:  Yes, I was asking about Design Studio.

A:  RRI is planned for 1.4

________________________________________________________________

Q:  Can it publish to a Portal KM folder?

A:  No

________________________________________________________________

Q:  Maybe I missed it, is support for drag and drop support for navigation components coming soon for DS 1.4 or later?

A:  Yes that is in the DS 1.4 roadmap slide

________________________________________________________________

Q:  Design Studio or Analysis Office, If I have IP(integrated planning)query with planning function, currently its possible to execute manually one by one . However If I have couple of planning sequences(combined) how can we execute all at once ?

A:  Analysis Office can execute via VBA macro; DS is also via script

________________________________________________________________

Q:  (Drag and drop at runtime, not design time, to be clear)

A:  Fragments  - draggable, new component, split container, familiar with Lumira > like viz pane from Lumira at runtime

________________________________________________________________

Q:  will we able to change measure to dimensions inside analysis for office similar to Web Intelligence

A:  no

________________________________________________________________

Q:  To use Design Studio for BW based customers, what is your recommendation? - Should we use BI platform or directly connect BW? What is the Adv & Disadv over this? Please note we have BWA.

A:  Performance is an issue on BIP; look at deploy at BW but lose the mobility that comes with BIP

________________________________________________________________

Related:

Upcoming Design Studio September Events - ASUG has you covered

Consider attending SAP TechEd && d-code .  Join ASUG for the ASUG SAP TechEd Pre-conference HANDS-ON: SAP BusinessObjects BI 4.1, SAP BW and SAP BW on SAP HANA – All in One Day, October 20th.  This includes exercises for Analysis Office and SAP BusinessObjects Design Studio. Register today

Also see:

Stay Ahead : Attend TechEd && d-code – Win Big SAP BI BusinessObjects HANA Hands-on Sessions

Upcoming ASUG webcasts (a subset):

Join SAP at the end of October for Reporting & Analytics 2014 INTERACTIVE conference - register here

3 Comments
Labels in this area