PP PI related T code list
CRC1 - Create Resource
CR24 - Create Resource Network
CR31 - Create Hierarchy
C201 - Create Master Recipe
C251 - Print Master Recipe
C223 - Maintain Production Versions
COIO - Order Info System for PP-PI
COPD - Print Process Order
COPI - Print Process Order ShopFloor Papers
COR1 - Create Process Order
COR5 - Collective Process Order Release
COR6 - Single Process Order Confirmation
COR6N - Single Screen Entry of Confirmations
COR7 - Convert Planned Order to Proc. Order
COR7_PC - Part.Conv.: Plnned Ord. to Proc.Ord.
COR8 - Coll.Conv.: Plnned Ord. to Proc.Ord.
CORK - Process Order Confirmations (Total)
CORM - Mass Processing
CORO - Create Process Order w/o Material
CORR - Collective Entry of Confirmations
CORS - Cancel Process Order Confirmation
CORT - Display Process Order Confirmation
CORZ - Process Order: Time Event Confirmat.
COA6 - Process Order: Archiving
COA7 - Process Order: Retrieval - Archive
COA8 - Process Order: Archive Management
CO56 - Display PI Sheet
CO58 - Maintain PI Sheet
CO59 - Delete PI Sheet
CO60 - Find PI Sheet
COPOC - Process Manufacturing Cockpit
CO53 - Control Recipe Monitor
O10C - Assig. Ctrl Rec. Dest./Proc. Instr.
O12C - Assign Charact. / Proc. Instr. Cat.
MD61 CREATE PLANNED INDEPENDET REQUIREMENT
MD11 CREATE PLAANED ORDER
MD01 MRP RUN COLLECTIVE
MD02 MRP SINGLE ITEM MULTI LEVEL
MD03 SINLE ITEM SINGLE LEVEL
MD04 STOCK-REQUIREMENT LIST(PLANNEC-PROCESS)
MD07 STOCK-REQUIREMENT LIST COLLECTIVE
MD40 MPS RUN(MRP - RUN)
MD41 Single Item Multilevel
MD42 Single Item Singlelevel
MD50 Sales Order Planing - Make to order planing
MD73 DISPLAY TOTAL REQUIREMENT
MD15 CONVERT PLANNED ORDER TO PURCHASE REQ.
MD16 DISPLAY PLANNED ORDER
MD45 PLANNING RESULT
CO24 MISSING PART INFO SYST
CM01 CAPACITY PLANING
CM02 CAPACITY PLANING
CM04 CAPACITY PLANING
MDVP COLLECTIVE AVAILABILITY CHECK(PRODUCT WISE)
MF63 STAGING SITUATION STORAGE LOCATION LEVEL
MD15 CONVERT PLANNED ORDER TO PURCHASE REQUISTION
MD14
MS64 COPY VERSION(CHANGE VERSION FROM INACTIVE TO ACTIVE)
COR7 CONVERT PLANNED ORDER TO PROCESS ORDER
COR8 CONVERT PLANNED ORDER TO PROCESS ORDER
COR1 CREATE PROCESS ORDER (MANUALY)
COR2 CHANGE PROCESS ORDER
COR3 DISPLAY PROCESS ORDER
COOISPI PROCESS ORDER INFORMATION SYSTEM
COHVPI MASS PROCESSING FOR PROCESS ORDER
MC01 LOGISTIC INFORMATION LIBRARY
MC02 INFO-LIBRARY
MC03 INFO-LIBRARY
MR21 PRICE LIST
CM05 CHECK FOR CAPACITY OVERLOD
MD48 CROSS PLANT EVALUATION
COR1 CREATE PROCESS ORDER MANUALLY
O0SC CREATE PROCESS ORDER BY SELECTING PRODUCTION VERSION
COOISPI PROCESS ORDER INFORMATION SYSTEM
COHVPI MASS PROCESSING FOR PROCESS ORDER
COR5 COLLECTIVE ORDER RELEASE
COR7 CONVERT PLANNED ORDER TO PROCESS ORDER
COIK PICIKING LIST
MB26 PICK LIST
MB25 RSERVATION LIST
MB21 CREATE RESERVATION
MB22 CHANGE RESERVATION
MB31 GOODS RECEIPT FOR ORDER
COR6N PHASE CONFIRMATION
CORS DELETE PHASE CONFIRMATION
CORR COLLECTIVE PHASE CONFIRMATION
CO53 CONTROL RECIPE MONITOR
CO55 WORK LIST FOR PI SHEET
CO54 PROCESS MESSAGE MONITER
CO60 FIND PI SHEET
CO64 WORK LIST FOR PI SHEET
CO67 WORK LIST FOR PI SHEET
Comments