Technology Blogs by Members
Explore a vibrant mix of technical expertise, industry insights, and tech buzz in member blogs covering SAP products, technology, and events. Get in the mix!
cancel
Showing results for 
Search instead for 
Did you mean: 
Former Member
0 Kudos


Issue :

Whenever we are trying to Finalize the change Request (CR) which belongs to country Jersey C I, we have received the process error because of  below error message.

Solution :

To resolve this issue we have followed the below steps.

1.SAP OSS # 1901429 the country Jersey, C.I. ( Code: JE) is related to GB (this country is a crown dependency of the United Kingdom). But when we verified the country’s global parameter setup it is pointing to US (Screen shot: 1). Hence I believe for this reason we are getting the above  error message.

We have mapped  the country code JE to GB parameters.

2. Then we tried to finalize the change request again we have received the process error. This time the error message as "No geocoder for country JE maintained in system (table GEOCODERS)".

To resolve this we maintained the  below entry in the path SPRO--> SAP NetWeaver -->General settings --> Set Geocoding --> Assign Geocoding Program to Countries.

3. After this entry we tried to finalize the CR and received the error message as “Geocoder SAP0: Country specification is incomplete (Customizing)”. To resolve this I maintained the below value in table V_GEOT005 & V_GEOT005S (for Region details).

 

I found these  values from the URL : http://www.theodora.com/country_digraphs.html (Country : JE --> Geography) . The Geography code is similar to country code GB.

4. After this, when we tried to finalize the CR,we received the error message as “Telephone/fax code for country code JE is not maintained”. Based on this we maintained the entry in the below path

SPRO --> SAP NetWeaver  --> General settings --> Set Countries --> Define Country

I have found the Jersey Calling code from the URL: http://countrycode.org/jersey. This code is similar to GB.

After completing the above configuration, again I tried to finalize the CR  and this time it has been successfully finalized and created the Vendor Master in ECC without any issues.

I believe it might an useful.

Regards,

Sada

Labels in this area