Spend Management Blogs by Members
Check out community member blog posts about spend management and SAP Ariba, SAP Fieldglass, and SAP Concur solutions. Post or comment about your experiences.
cancel
Showing results for 
Search instead for 
Did you mean: 
Former Member

To replicate the vendor master changes from R/3 to SRM on a daily basis, we need to schedule a new job “BBP_VENDOR_UPDATE_DATA_JOB”.

Step :  1

We have selected the Vendor Master # 9002876 and changed the Vendor name to Grainger to Test For VM Change update – Sada and also we blocked this vendor for all Purchasing orgs.

Vendor address details as below in R/3

Vendor # 9002876 blocked data in R/3.

Step : 2

We have verified the Vendor details in SRM and it contains with old Vendor name.

Step : 3

We need to  use the t-code SM36 / SA38 to schedule the job (create a variant based on your requirement and assign to this job) for the Program BBP_VENDOR_UPDATE_DATA_JOB on daily basis.

Step : 4

Once the job is completed in SRM the vendor# 9002876 details are successfully updated in SRM  T-code PPOMV_BBP.

Step: 5

After the Vendor master replication, we have tried to create the SC for the Blocked vendor # 9002876 and we are able to receive the error message as Vendor 0009002876 is locked for organizational unit United States Purchasing Department  (Item  t ) “ as expected in SRM portal.

                    

Based on this job schedule in SRM  the vendor master changes in R/3  will automatically replicate from R/3 to SRM.

1 Comment