I wrote about this using an earlier version of Design Studio - see this link.
I thought I would clarify the steps some more. Note you must be on enhancement package 5 or higher in your ECC system.
Figure 1
Figure 1 shows you need to flag your Infoset for "BI Allowed"
Then you create the BEx query against the InfoSet
The BEx Query is the data source to Design Studio.
I also show how to do this in the following video (no audio):
For sure learn more about Design Studio at BI 2013 and on Monday there is an ASUG Webcast.
Also ASUG is offering a hands-on BI4.1 session as a pre-conference session on Monday, May 13th, including hands-on with Design Studio. Register here.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
55 | |
5 | |
5 | |
4 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 |