Enterprise Resource Planning Blogs by Members
Gain new perspectives and knowledge about enterprise resource planning in blog posts from community members. Share your own comments and ERP insights today!
cancel
Showing results for 
Search instead for 
Did you mean: 
former_member184574
Active Contributor

Batch Derivation :


Transferring batch characteristics values or batch master fields from the sender batch to the receiving batch is called “Batch Derivation”.

The component batches can pass on their Field values/characteristics values to the manufactured batch.

Scenario :


Minimum value of Manufacturing date and Expiry Date (SLED) of the component materials batches are to be transferred to header material batch during process order release automatically


Process Flow:


  • Create BOM and Recipe for Header material  - CS01
  • Create condition records for sender receiver materials - DVCO
  • Create Process Order - COR1
  • Do the batch determination for components - COR2
  • Release the process order - COR2
  • Check for the batch derivation - MSC3N


Detailed Flow:


Create BOM for header material as shown below....and also create master recipe for the header material....


Now go to transaction DVCO

Enter the relevant details Material, Plant, usage as shown below and select the derivation event as during Release of process/production order


then click on execute


Now click on create button



add two fields  SLED and Date of manufacture as shown below

Drag and Drop these two to Left side materials to create sender and Receiver condition records….


select the comarative as minimum as shown below for value selection during derivation...




Then Save


Now check the batches of the two component materials and values of their Manufacturing date and SLED....

First component is 2160

Batch S1 with MFG date as 14.08.2013 and SLED as 31.12.2014

Now check for second component is T-RJ200

Batch 1234 with MFG date as 01.07.2013 and SLED as 31.07.2014

Now create process order for header material as shown below...

Create batch for header material as shown below...

save the order

go to change mode

Assign the batches to the components manually or through batch determination as shown below.....

Now Release the process order



Now save the process order



Now during process order release batch derivation gets triggered and values gets transferred to header batch automatically...

Now check in the Batch of the header material whether MFG date and SLED are updated as per the requirement...


MFG date: 01.07.2013 is the minimum of 14.08.2013 (Batch S1 material 2160) and 01.07.2013 (Batch 1234 material T-RJ200)

Shelf Life Exp. Date: 31.07.2013 is the minimum of 31.12.2014 (Batch S1 material 2160) and 31.07.2013 (Batch 1234 material T-RJ200)

Thanks

Kumar


8 Comments
Labels in this area