SAP Integration Scenario
HR-PDC connects subsystems that are used to enter and record personnel times (clock-in / clock-out) and employee expenditures to SAP HCM. Technically, HR-PDC was constructed as an asynchronous SAP NetWeaver BAPI interface.
This Integration Scenario is also available with SAP Business Suite powered by SAP HANA.
- Getting Started
- Technical Documentation
- Test System Recommendation from ICC
- Price List
- Benefits of Certification
- Related Content
Getting Started
Technical Documentation
SAP ECC on SAP HANA
The technology platform of the interface has changed; the scope of certification has not been changed. Recertification is optional, but advised.
SAP ECC 6.0
HR-PDC was introduced as a certifiable release earlier.
There were no changes to HR-PDC in this release.
In addition to the technical interface specifications, please also refer to the applicable SAP Solution Manager Ready.
Test System Recommendation from ICC
Price List
Benefits of Certification
- After successful certification testing the ISV solution can be advertised with one of the following logos depending on the used technology platform:
- This Certification Scenario is "SAP Solution Manager Ready"
- Platform User License is available for this scenario
Related Content
Important Links:This is the central homepage for SAP NetWeaver Capabilities on SDN. This is SDN Homepage. You may also link to SDN blogs, external web sites, or related PM web pages.
SAP Training and Help:Please refer to SAP Education.
ICC Webinars You are invited to join our introductory webinars - hosted by the SAP Integration and Certification Center in regular intervals. For a schedule and recordings got to the page "SAP Integration and Certification Webinar Series".
Apply for ICC Services right away - please fill in the SAP ICC online application form
Partner Information Center: Certified solutions can be found in the Partner Information Center (PIC)
on Nov 9, 2006 12:00 AM, last modified by