Work Center Formula Query

Gaurav Thakkar
Currently Being Moderated

Hi All,

 

We have created a formula Labor * SAP_09 / SAP_08 where SAP_o9 is operatonal Quantity and SAP_08 is Base Quantity.

 

Labor is specified in Standard Value key.

 

Now, if i post the Activity with refernce to routing and specify the No as 100. Then it will show me the Hours multiplied by 100.

which is fair enough as specified in formula.

 

But i dont want to consider the Reference Routing . I.e . if i enter quantity in refernce routing then it should display the value secified in routing .i.e. the value should be constant.

 

I tried to remove parameter SAP_09 from formula. But after that it is not giving any value.