3 Replies Latest reply: Mar 7, 2012 1:43 PM by Sandip Shaktavat RSS

Production Confirmation cancellation issue

Tanuj Parikh
Currently Being Moderated

Dear All,

 

After Production Confirmation (101), stock is in QM and Insp Lot Status is REL. Still System is not allowing CO13 as well as CO11 with 102/262, saying "Change the inspection stock of <material> in QM only".

 

Inspection Type: 04, 05 is activated for both Produced Material (101) and consumed material (261). We tried by removing 05 inspection type for both Materials.

 

Above error message appeared for Producted Material (101).

 

Ideally, System should allow to cancel Production Confirmation when stock is in QM with REL status.

 

Request to guide what went wrong.

 

Regards,

 

Tanuj Parikh

Actions