capacity planning, levelling and loading in work centers

shanker rsv
Currently Being Moderated

hi,

 

we have some 17 work centers existing. We asked to look into capacity planning, levelling and loading in work centers.

a total of 35 staff is allocated to mnt dept and orders are taken by their own on dial basis. some may sit ideal.

we want assign orders or operations to all the staff

how capacity planning is implemented in sap pm.

Please explain me steps with corresponding t codes.

thanks in advance.

 

RSV

  • Re: capacity planning, levelling and loading in work centers
    shanker rsv
    Currently Being Moderated

    sir,

     

    someone please respond to my query.

     

    RSV

    • Re: capacity planning, levelling and loading in work centers
      Ritesh Tirpude
      Currently Being Moderated

      Hi

       

      Don't no how much it will help,

      For Capacity Planning

      you have to check Capacity Availability Setting in "Define Inspection Control" (OIOI)

       

      Like No Check - should not be ticked.

       

      Overall profile -  SAPPM_G013 PM: Capacity availability check >= 3.0D

       

      Collect. conversion  - Here Select as per your requirement. (for eg.-3 No release if capacity is insufficient)

       

      Then go to your work center there in Capacity Tab  at the bottom there is another Capacity Tab Icon, click on it

      here maintain as per following  given as example

       

      Capacity planner grp- MNT

      Factory calendar ID- as you defined

      Base unit of meas.- H

      Start - 09:00:00

      Finish -17:00:00

      Length of breaks- 01:00:00

      Capacity utilization - 100%

      No. of indiv. cap.(for eg. No of People in this Work Center) - 1

      Capacity             7.00         H

       

      then save.

      Here as per above example I have 1 WC which have 1 individual having cappacity of 7H.

      One Maintenance order is created of 7 H, & released it.

      Now again one maintenance order is created on same date & time having same timings

      so when ever you go for releasing the  maintenance order then as per your config setting in OIOI,

      it will give you message that for Order No.XXXXX WC with Over Load.

       

      Also refer below link may be helpful to you.

      http://scn.sap.com/thread/3156892

       

      Regards

      Ritesh