cancel
Showing results for 
Search instead for 
Did you mean: 

Change interface value in a standard process

Former Member
0 Kudos

Hello all,

I got the class "CL_CRM_IU_PR_CNTR_END" which include the parameter "CONTEXT". This parameter has as reference type the IF_CRM_IU_PROCESS_CTXT interface which include different methods.

I´m wondering if it would be possible to modificate any of the values given to the "CONTEXT" parameter within the standard process. I would like to change some values but without change the standard process (running it as usual). As the values are different, the standard process should act accordingly (e.g forcing a contract end process by dunning)

Thanks a lot in advance

Regards

German

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi German,

How you can get that parameter CONTEXT?

I need to read to create a switch document, using method CL_CRM_ISU_ORDER_DEREG=>CREATE_SWITCH_MESSAGES.

CONTEXT is a import parameter...

Thanks,

André

Former Member
0 Kudos

Solved