on 09-04-2008 5:12 PM
Folks,
I'm struggling to make 2-step w/ planned cross docking work. Basically, unable to connect the planned with the candidate document.
Here is the scenario:
1. (Candidate) Outbound delivery created with a delivery date / time of 09/04/08 - 10:00 (No TO initiated)
2. (Planned) Inbound delivery created with a delivery date / time of 09/04/08 - 12:00 (No TO initiated)
The system invokes different messages based on the following config. settings: (These messages occur when I right click on the inbound delivery and select "plan cross docking")
Setting 1:
Planning time: 1 D
Default Release: 1D
Def Latest Release: -
Message: No inbound documents have been selected for planning
Setting 2:
Planning time: 1 D
Default Release: 1D
Def Latest Release: 1D
Message: Time ref. 09/04/2008 10:00:00 of plan.doc. xxxxxxxxx does not match cand.documents time refs
BTW, it's a simple setup WITHOUT transportation, yard management, HUM or SUT.
Thanks in advance for your valuable comments!!
Hi Kalyan,
Were you able to figure out the solution of this problem? I am am struck in a similar situaton where I get this message.
No inbound documents have been selected for planning
or
No outbound documents have been selected for planning
When both the inbound and the outbound document shows up in the cross dock monitor, why am I not able to plan them?
I would be really thankful if you can provide me with the solution.
Thanks in advance.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Imran,
The error message (LXDCK001, isn't it?) points at a timing problem but I'm sadly at a loss as to its cause. These are my settings on warehouse number level in detail, in case you wish to compare them to yours:
Two-Step: /
Storage Type: /
OppXDck: 01
Consider FIFO: /
FIFO Tolerance: /
FIFO UoM: /
Time Ref: 01
Planning Time Window: 1,0
Default Release Time: 1,0
Def. Lat. Release Time: 1,0
UoM: HR
As mentioned before, an inbound delivery with delivery time 10:00 and an outbound delivery with delivery time 12:00 (same day) can be assigned to each other in planned CD based on these settings.
Best regards,
Christiane
Edited by: Christiane Schnellenbach on Mar 5, 2010 6:26 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Let me know have configured warehouse, if so
maintain Palletization data in WH view 2.
and do the planning.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Imran,
Yes, the planning window is calculated by deducting the planning time from the latest release time. To my knowledge, the release time is only relevant to Yard Management. I tested your scenario (inbound delivery time 10:00, outbound delivery time 12:00, latest release time and planning time 1 hour each) and was able to link inbound and outbound delivery in a CD decision, as expected. Could you please try again with new documents and let me know the result? Thank you.
Best regards,
Christiane
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Guys,
were any of you able to solve this issue ?
Also it will be great if anybody can post the configuration for this IMG
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Imran,
Your problem is indeed caused by a similar situation: The "latest release time" of your outbound delivery is 09/04/10, 11:00, as is the "release time" (12:00 - 1 hour). Since your planning time is again 1 hour, the slot for Cross-Docking for that outbound delivery is from 10:00 to 11:00. The delivery time of your inbound delivery (9:00) is thus outside the slot, and the system consequently refuses Cross-Docking.
Best regards,
Christiane
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Christiane,
First & foremost appreciate your quick response.
As per what you say (& If I have understood it correctly) having the Delivery Date & Time of the Inbound as 09.04.2010 10:00 would solve the issue ? I did change the Inbound Delivery time but to no avail.......as per my example.....what do you think should be the Inbound/Outbound Date & Time
If I understood right, as per my example, the Outbound Delivery time is set to 12:00, the latest release time is set to 1 hr thus the latest time for the outbound to be released is 11:00 (Outbound Del time - latest rel time)
Planning time is again 1hr, so planning window is from 10:00 to 11:00 - [(Outbound Del time - latest rel time) - Planning time]. Hence if I set the Inbound time to 10:00 it should work right ?
The release time, what effect does this have ?
Looking forward to your help.
Imran
Dear contributers,
In case some of you are still interested in the issue, here is my guess: From the description of the scenario I infer that the "Time Reference" for CD is set to 01 ("Delivery Date & Time"). If the "Planning Time", the "Default Release Time" and the "Default Latest Release Time" are all set to 1 day, the time slot for planned CD is 07/04/08, 10:00, to 08/04/08, 10:00. You will thus never be able to match the two documents (delivery date/time of both: 09/04/08).
Explanation: If the outbound delivery has the delivery time 09/04/08, 10:00, the "Default Release Time" is 08/04/08, 10:00. The "Default Latest Release Time" is again 08/04/08, 10:00, because the default value is 1 day for both. The system calculates the start of the time slot for planned CD by deducting the "Planning Time" from the "Latest Release Time", in our case again 1 day.
The default values for release time and planning time are thus better set to a couple of hours instead of days.
Best regards,
Christiane Schnellenbach
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Christiane,
Can you Pls clarify the above.....am having a similar situation:
My outbound delivery has the delivery time 09/04/10, 12:00 and My Inbound delivery has the delivery time 09/04/10, 09:00
Time Reference for CD is set to 01 ("Delivery Date & Time"), "Planning Time", the "Default Release Time" and the "Default Latest Release Time" are all set to 1 Hr.
I still get the error stating that " time ref for planning doc. does not match the candidate docs reference time"
Pls guide me in overcoming this issue.
Rgds,
Imran
HI Guys,
Can you check the User Id's time zone and server time zone.
Hope this helps.
Thx
MJ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.