on 11-06-2008 9:17 AM
I am unable to read master data and thus change the status of process order from REL to CRTD. (COR2)
The reason it says, error in BOM reading, Transport Requirement (TR) already generated.
Even after deleting the TR (LB02), the issue still exists.
Is there another way of changing the status or some more steps are needed for the TR deletion?
Thnx!
Abhi.
closing
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We were having the same issue. The workaround for this problem is to set all of the component quantities in the order to zero and save. This will reverse the transfer requirement and this will allow you to re-read the master data and reset the order status to CRTD.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Abhi,
What is the complete Order Status?
Regards,
Dhaval
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Order header Status-
REL Released
MSPT Material shortage
PRT Printed
PRC Pre-costed
BASC Batch assignment complete
BCRQ Order to be handled in batches
SETC Settlement rule create.
In the error log it gives-
Diagnosis
Transfer requirements have already been generated, so therefore the bill of material cannot be read.
System Response
The system does not execute the action.
Then I deleted the TR (LB02), but still I cannot reread the master data.
The MSPT was for only 2 materials out of 6 and there is no GMPS status.
There is prod supply area and control cycle used.
and the TR generated at order release.
Thanks for the replies
1) TO has not been generated yet. Its in TR status.
So, there is no batch number for deletion in the process order as the batch number would be automatically generated during TO process.
and that hasn''t happened yet.
2) I looked at the ->List 'Documents for Order' and
there is no TO, just TR with all the components listed,
I deleted the TR and came back to the process order to check the documents for order 'Log for staging'.
It gives: 'WM staging of materials successfully completed'
I think deletion of TR does not reverse the staging. Some other thing has to happen in order to reverse the staging.
Thoughts/ comments?
Hi,
In Read PP master data, the status changes to Process order from REL to CRTD.
While reading the BOM and routing u2026.. Mark explosion date properly and read again master data. If any confirmation or GI or GR happened then system not allowed to Read the data.
Make sure all Transfer requirement deleted.
Regards,
Sulabh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.