Engineering Change Management

Former Member
0 Kudos

HI,

Can anybody tell me more about Engineering Change Managment. Uses and how to activate it if its not been activated.

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear sam,

check my replies in these links..

[How to make ECM mandatory for BOM?| ]

[ECM/ECR |;

[ECM for BOM|;

[ECM Revision Levels|]

Still if you need any help regarding this means,please revert back.

Regards

Mangalraj.S

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Pls. find more details about Engineering Change Management ;

Engineering Change Management

Technical name: SAP_LO_ECH_MAINTAIN

Tasks

The Engineering Change Management processor creates simple change master records and engineering change requests and processes them further. He prepares the change to the production order or the purchase requisition in that he identifies the requests or purchase requisitions affected by a change. In addition, he carries out the reporting of the Engineering Change Management.

This single role also includes the workbench for Configuration Management, since this can not be used effectively without Engineering Change Management.

Activities in Engineering Change Management

Change number

Transaction

Activity

CC01

Create change number

CC02

Change change number

CC03

Display change number

Object management record

CC22

Change object management record

CC23

Display object management record

Engineering Change Management for production orders

COCM

Change order process u2013 source item

Revision level

CC11

Create revision level for material

CC12

Change revision level for material

CC13

Display revision level for material

CC15

Change revision level for document

CC16

Display revision level for document

Reporting

CS80

Material BOM change document

CV80

Document BOM change document

CS82

Order BOM change document

CC05

Change overview

CC60

Change hierarchy

CJ00

Find digital signatures

Configuration Management

CMWO

Configuration Management workbench

Hope this helps.

Regards,

Tejas

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

The Engineering Change Management process uses Engineering Change Masters (ECM) in SAP to provide history for BOMs, Rate Routings, & Reference Rate Routings. This procedure defines how to:

Create and change Engineering Change Masters.

Utilize Alternative Dates to establish different effectivity dates for the same change to different BOMs, Rate Routings and Reference rate Routings.

Following are the some commonly used T-codes

CC01

Create change number

CC02

Change change number

CC03

Display change number

In the config of Material master , BOM, Master Recipe, Routing & other master date we config that whether changes can be done with history or w/o history, the change number to be enterred mandatory or not.

Please refer this link,

[Engineering Change Management|http://www.sap-img.com/pp007.htm]

http://help.sap.com/saphelp_47x200/helpdata/en/d8/731cab4b7511d1894b0000e8323c4f/frameset.htm

Regards,

R.Brahmankar

Former Member
0 Kudos

Hi,

Engineering Change Management is used to track and control all the changes with reference to Material master, BOM, Work Center & routing. First you need to create a Change master thru CC01 T-code, it will give one change number. Using this no you can change all the masters. By default u need to activate the change number, thru ABAP program uou need to activate this field as a mandatory. Through authorisation we can control the access.

Regards,

V. Suresh