"Scrap Generated' col is not getting updated after reconciliation.

The waste that is generated during the process of subcontracting. This is mentioned as the percentage of process scrap in the bill of material of the parent material against the child material.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi:

In J1IFQ you won't get any option to enter the scrap quantity it is is greyed out.

This is because yuo must have defined scrap in BOM,so while reconcillation system would consider the quanitty less the scrap amount generated.

Cheers

Rahul

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

while reconsiling the SC challan by J1IFQ u mention the scrap QTY or if already done, try with J1if11

Former Member
0 Kudos

In J1IFQ, u wont get the option to enter in Scrap generated Col. It is greyed out.