hi,
I have run normal make to order scenario and in which i have confirm operationwise confirmation but the final goods movement not updated automatically.it is confirmed by manually by T -code mb31. WHY ?
Thanks
Parag
Hi Parag,
Please check both control key parameter, if auto gr tick is there for both control key it wont work.
so remove tick from first control key PP01
Hope it will solve your problem....:)
Revert Points
Regards,
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Parag Bhaisahab,
I think you should start right from beggining check all ur master data..if u have maintained auto GR at production scheduling profile and maintained the confirmation parameters with goods movement allowed it should solve your problem.
create a new sales order run mrp convert planned order to production order release the order and do the confirmation.
or u still want to do it with ur current prod order in co02 do 'Read PP master data' then repeat the whole thing.
Regards,
Manish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Parag,
For Auto Goods Receipt You have to use Control key (PP03) with Auto Goods Receipt in the last operation of your Routing.
or
In Production Scheduling Profile (t.code OPKP) for Production Orders activate Check box for Automatic Goods Receipt.
But but but, if you are going with Co Product Scenario then above both Settings doesn't work.You have do Manual GR only by MB31.
Regards,
Dhaval
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Check the routing and let us know what is control key you have maintined. In control key maintained in the routing i guess you have NOT ticked Automatic GR.
Check it and come back.
Regards,
satyajit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
you need to use AUTO GR control key PP03. in the lost operation,
check control key
then only sytem will do auto GR
in OP67, select the control key and in that there should be Auto GR indicator tick?
-ashok
Edited by: Ashok Keerthipati on Dec 10, 2008 5:08 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Parag,
1. go to OPK4> select ur plant and order type> click on details.
2. In OPK4 genarally valid settings tab-->Goods movement box at right bottom corner-> select all components.
3. InOPK4 Genaral indv. entry tab->Error handling Column->select all except Acc. cost.
4. Create new order test and come back
sree
Dear,
If you want to do the GR automatically you have to the configuration settings. Then you can achive what you required.
revert for any query.
Regards,
Ganesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Parag,
1. If u maintained all the settings, in ur routing for the last operation maintain control key PP03.
2. while confirming operation in CO11n/CO15, enter all confirmation data and for the final opeartion in the main screen of CO11n/CO15 on top left click on Goods movement push button, then it will take to the Goods movement screen here u can see the material coming in to stock with 101 mov. type. and save it.
3. Go to order display/ change check deliverd qty field got updated or not.
4. If updated check the stock in MMBE, where it lies.
5. if it lies in quality stock column, do result recording and UD in QA32 to bring it to unrestricted stock
test it and reply
sree
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.