Replenishment job(LP21)

Former Member
0 Kudos

Hello,

I am facing an issue with RLLLNACH1 (replenishment job using LP21).

It is not creating the TR and job is getting complete but showing this message in log.

(Replenishment method 1 set in storage type. See long text

Message no. LP325) , whereas message type is W.

Date Time Message text Message class Message no. Message type

18.12.2008 11:00:05 Job started 00 516 S

18.12.2008 11:00:05 Step 001 started (program RLLNACH1, variant TEST-REPLMNT, user ID CPS) 00 550 S

18.12.2008 11:00:05 Replenishment method 1 set in storage type. See long text LP 325 W

18.12.2008 11:00:05 Job finished 00 517 S

Any idea, to create the TR.

Regards,

JPS

Accepted Solutions (0)

Answers (1)

Answers (1)

andrzej_chmura
Contributor
0 Kudos

Hello,

just see long text for LP325 warning message and you will get the answer:

Diagnosis

In the storage location, the replenishment technique 1 is set. This means that the replenishment takes place directly for TO confirmation per transfer order, if the minimum quantity is fallen short of. As a result, open transport requirements are not taken into consideration.

You start the replenishment report, which is scheduled if no special replenishment technique is set for the storage type. This replenishment report generates transport requirements, which, however, are not taken into account for automatic replenishment from transfer order confirmation. Therefore, it can happen that, in total, too much replenishment is requested for individual storage bins.

Procedure

Check whether you have entered the correct storage type.

Andrzej

Former Member
0 Kudos

Thanks,

Please suggest any thread to overcome this or which setting remove to create the same...

Regards,

JPS

andrzej_chmura
Contributor
0 Kudos

Hello,

it is customizing setting:

Logistics Execution>Warehouse Management>Interfaces>Define Production>replenishment movement type-->Assign:

Set Replenishment method in the storage type (Replenish.) field to replenishment method - ' ' Replenishment report

Andrzej

Former Member
0 Kudos

I have already made that setting earlier but now removed 'Auto TO' from 319 mvt typ.

And now getting this....( but my storage type is not 500 and it is correct in the variant)even there is no open TR existing

-


Replenishment for fixed bins in whse 500 stor.type 500 not possible now

Message no. LP314

Diagnosis

Replenishment has already been requested for storage type V05 in warehouse number 500.

Procedure

Please try again later.

-


Regards,

JPS

Former Member
0 Kudos

sorted...