cancel
Showing results for 
Search instead for 
Did you mean: 

Solution Manager Charm configuration

Former Member
0 Kudos

Hi @all,

I´am using SAP Solution Manager 7.0 SP 15. Configurated all Charm Steps successfully.

The SAP Solutoin Manager - Scenario- Specific Settings - Change Management - Extended Configuration -Checks - Execute Check Report is green

I can´t open any hance cycle in solar_project_admin - System Landscape - Change Requests , Create Task List, I get the result "project is not released. hance cycle can not be created".

If i click "check", there are three errors:

Message from function module /TMWFLOW/CALC_SINGLE_TRACK: No source system

(Message no. /TMWFLOW/TRACK_N103)

No track for project DF_WART_01 with log. system A36/200

(Message no. /TMWFLOW/CM_CHECK038)

CTS projects in production systems for project DF_WART_01

(Message no. /TMWFLOW/TASKLIST190)

System change options are empty.

In my authorized Change Requests - related documents (next document). i get "there are no actions in the Worklist"

i´ve no idea where my fault is. I hope you can help me.

Please suggest.

Best Regards

Daniel

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

hi,

Check the logical component assigned in your project, DEV and QAS are assigned.

CTS projects in production systems for project DF_WART_01

CTS should be created for the DEV system not in QAS , PRD. This project should be transported to QAS then to PRD. I would suggest you to delete all the IMG project created as part of your Solman Charm project and create a new IMG only for DEV environment.

raguraman_c
Active Contributor
0 Kudos

Hi,

Please check this note 797901. This might help you.

Feel free to revert back.

-=-Ragu

Former Member
0 Kudos

Hi Ragu,

thanks for your fast answer.

unfortunately porblem isn´t solved.

Your note isn´t for my release.

I´ve the problem that my project isn´t released.

Have you any idea where I can release it.

"project is not released. hance cycle can not be created".

Now I have created a new maintenance project, I´ve configured everything, when I check it, I get two errors:

No consolidation system found for A36-200 (project DF_SOLMAN1)

Message no. /TMWFLOW/TRACK_N806

No track for project DF_SOLMAN1 with log. system A36/200

Message no. /TMWFLOW/CM_CHECK038

System change options are still empty.

Any more idea?

Regards Daniel

0 Kudos

Hallo,

we have the same problem.

Has someone already a solution for this.

Regards

Christian

Former Member
0 Kudos

any gained insight on the "No track for project DF_SOLMAN1 with log. system A36/200" error?

TomCenens
Active Contributor
0 Kudos

"

Now I have created a new maintenance project, I´ve configured everything, when I check it, I get two errors:

No consolidation system found for A36-200 (project DF_SOLMAN1)

Message no. /TMWFLOW/TRACK_N806

No track for project DF_SOLMAN1 with log. system A36/200

Message no. /TMWFLOW/CM_CHECK038

"

I noticed that this thread is pretty old already but I bumped into similar error messages and in the end it was caused by a TMS route configuration that didn't match the configuration of the logical component that was in use.

You can pretty easily verify this through SMSY. Navigate to your logical component there, select the line of the system assignment and click on Shipment Routes button. If you get an empty screen back, then your TMS transport route configuration doesn't match your logical component configuration.

For example, you've got DEV 100 - DEV 200 - PRD 100 for a CHARM demo landscape. If your TMS transport route configuration matches this but your logical component has DEV 100 assigned as Quality Assurance, then your configuration check for CHARM will fail because there is a mismatch.

When your configuration is correct, so both your TMS transport route as your Logical Component (system role assignment), then you should get a transport route configuration back (visible) after clicking Shipment Routes.