cancel
Showing results for 
Search instead for 
Did you mean: 

Update superior equipment status based on sub equipment status

Former Member
0 Kudos

Dear friends,

I have a scenario for calibration process for which there are two equipments .One sub equipment and the other superior equipment. Calibration process is done for sub equipment and I have given usage decision as rejected based on which sub equipment staus gets updated as NPRT(PRT not ready for use). Now the client requirement is as that the superior equipment also get the status NPRT since they are linked through superior/sub equipment relation. Kindly suggest some solutions.

best regds

Arun

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Dear friends ,

I have observed that if a sub equipment is assigned to a superior equipment ,the equipment status of sub equipment does not get updated when calibration process is run.(NPRT status does not get updated if an equipment is installed to a superior eqpt when usage decision is made for not accepted). So there is no possiblity of updating the superior equipment status. Hence kindly ignore my query.

best regds

Arun