cancel
Showing results for 
Search instead for 
Did you mean: 

Scheduling overview

Former Member
0 Kudos

Dear friends,

I have a reporting requirement which is almost met through IP19 scheduling overview report except for the field Basic finish date in maintenance order (GLTRP). Is it possible to develop the required report by copying the same program and adding the additional field .

Thanks and best regds

Arun

Accepted Solutions (0)

Answers (2)

Answers (2)

peter_atkin
Active Contributor
0 Kudos

Arun,

Yes you can copy the IP19 program(s) and add your own fields as required.

But before you do that, if you are using ECC6, then check if there are any suitable enhancement spots in the standard program.

PeteA

Former Member
0 Kudos

Thanks for the reply.

I will check with the ABAPer for suitable enhancement spots.

Incase any one has worked on similar requirement with enhancement spots kindly provide the details.

best regds

Arun

Former Member
0 Kudos

Hi,

Its possible & find out if there is any BAdI or User Exits available.

regards,

Venkatesan Anandan