CNS41 report

Former Member
0 Kudos

In the structure overview report,The planned cost of the materials attached to the activities are displaying as zero,but all the material costs aggregates to the activity and shows as the total cost.but when we make GR actual costs are getting displayed against each and every individual material.Why is it so.How can we display the planned cost of the material in the structure overview report itself against individual material component?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check the Valuation category in IMG,whether you have defined the valuation category field correctly.

Check for the valuation class of the material & G/L assigned to the Valuation class,

Check whether you have define the valuation catogory in IMG with this G/L or not,if defined then it will shown the planned cost.

Check in OPI1.

So check it.The planned cost is displayed from here only.

Regards,

Raj