The schenrio is , I have a finished product for which i assigned a serial number, also the child material has a serial number, when i confirm the finish product qty in MFBF, the system is asking for serial number for finished product, when i click post with corrections , and save. GR and GI is posted.

System is not asking for serial numbers for child material i have assigned the serial number profile and procedure to the child material

In the material document ,The serial number is not coming for child material.

Please help

Thanks in advance.

Warm Regards

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

For the child parts, whether you maintained serial numbers anywhere in the system..

Do u create production orders for the child components, during production order creation,do u assign serial numbers for the child materials...

please revert..

karthick

Former Member
0 Kudos

Hi Karthick,

Yes , I have maintained the serial number for the child component, the child component (Battery) is a raw material getting consumed in finished.part) Chassis)

The finished product is a chassis Assembly for which there is a serial number (vehicle identification number), on the main conveyor , the battery gets attched to chassis ( Child material) , there is a serial number for each battery., already maintained.

When i do the backflush, the system is asking for S.no of finished part but not asking for s.no of child

material. when is check the material doc. it is showing the s.no for finished but not for the child,

Thanks

Warm regards

Former Member
0 Kudos

Dear Adhish,

you have not yet told me when and where will you give the serial number for the child components...

please tell me that..

karthick

Former Member
0 Kudos

Dear Karthick

The child material will be procured externally , and serial number will be maintained for the same.

During GI , i want that system should ask those serial serial number, and it should be reflected in the material doc. I am not creating any production order for child component.

Regards

Former Member
0 Kudos

Check the serial number profile in the material master,work scheduling view of both the child and final material...

If the serial number profiles are different, then in OIS2, select the serial no.profile of the child material, lake the options as mandatory or obligatory...in the detail screen..

please try this...

karthick

Former Member
0 Kudos

Dear Karthick,

I have maintained the serial number profile 0001 .in the T.CODE OIS2 , same for both the finished and child. and obligatory.

It is showing the s.no for finished in the mat. doc but not for child.....donn know y..

Regards