on 05-07-2009 10:34 AM
Hi,
While confirming an order thru t/c co15, in the Gooda movement tab, GI by mmt type 261 is acceptable.
while GR through mmt type is 101 is not accepting.
why is it so?
Best regards,
K.Kumar.
Hi Kumar,
For FERT GR, we have two cases.
1. With Manual GR, During confirmation we can't do GR (101 Mvmt) for Finish product. We have to do it in separate transaction either with MB31 or MIGO.
2. If you want to do it automatically, the either set control key with auto GR in last opeation or configure in scheduling profile and assign to material master. Then when u confirm last operation, automatically GR happens for FERT.
Shiva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Kumaran,
For GI of components with order confirmations either you need to specify the backflush indicator against the components in the component overview.
For FG to have auto GR either assign the control key with auto GR indicator tick to the last operation in the order or maintain the production scheduling profile with auto GR ticked.
Even if the material is FG or HALB, when the production order is created for any FG or SFG (HALB) you can have auto GR for both the material irrespective it is FERT or HALB.
Hope this helps you.
SmanS
Hi Kumaran,
If you want automatic GR while confirmation then you need to use scheduling profile 00002 in material master or assigend control key to last operation in routing which has Auto GR tick mark
Hope this help you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
in this case you can do the 101 mvt type
use MIGO T code by using 101 mvmt type
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Have you define control key with auto gr or Scheduling profile OPKP with auto GR and assign it to the material master work scheduling view?
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
Are u using the follwing T-codes MB1A-261 , MB31 101 while doing this are u getting problem ...
Regards
Ramanujam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Is it giving any error for 101 mvt type. Kindly clarify.
I am not sure what you are trying to ask. Please rephrase your question.
Regards,
Satyajit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
satyajit,
In t/c CO15, I enterd both mmt types, 101 & 261. Will the system allow me?
System is not accepting 101 mmt type.
Message what i have got is "Goods Receipt items cannot be entered".
Goods receipt items cannot be entered
Message no. RU426
Diagnosis
You have manually added a new row with a movement type (unplanned goods receipt) to the goods movement overview or you have changed the movement type in an existing line.
System Response
You are not allowed to enter unplanned goods receipts during confirmation. In addition, the system does not permit you to change a goods issue item into a goods receipt item or vice versa by changing the movement type.
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.