18 Replies Latest reply: May 8, 2009 6:03 AM by Mangesh S RSS

CO15

kumaran k
Currently Being Moderated

Hi,

 

While confirming an order thru t/c co15, in the Gooda movement tab, GI by mmt type 261 is acceptable.

while GR through mmt type is 101 is not accepting.

 

why is it so?

 

 

Best regards,

K.Kumar.

  • Re: CO15
    Satyajit Kumar
    Currently Being Moderated

    Hi,

    Is it giving any error for 101 mvt type. Kindly clarify.

    I am not sure what you are trying to ask. Please rephrase your question.

     

    Regards,

    Satyajit

    • Re: CO15
      kumaran k
      Currently Being Moderated

      satyajit,

       

      In t/c CO15, I enterd both mmt types, 101 & 261. Will the system allow me?

       

      System is not accepting 101 mmt type.

       

       

      Message what i have got is "Goods Receipt items cannot be entered".

       

       

       

       

      Goods receipt items cannot be entered

      Message no. RU426

       

      Diagnosis

      You have manually added a new row with a movement type (unplanned goods receipt) to the goods movement overview or you have changed the movement type in an existing line.

       

      System Response

      You are not allowed to enter unplanned goods receipts during confirmation. In addition, the system does not permit you to change a goods issue item into a goods receipt item or vice versa by changing the movement type.

  • Re: CO15
    rama nujam
    Currently Being Moderated

    HI

     

    Are u using the follwing T-codes  MB1A-261 , MB31 101 while doing this are u getting problem ...

     

    Regards

    Ramanujam

  • Re: CO15
    Rupesh Brahmankar
    Currently Being Moderated

    Dear,

     

    Have you define control key with auto gr or Scheduling profile OPKP with auto GR and assign it to the material master work scheduling view?

     

    Regards,

    R.Brahmankar

  • Re: CO15
    Sreenivasulu Gurijala
    Currently Being Moderated

    Hi,

    in this case you can do the 101 mvt type

     

    use MIGO T code by using 101 mvmt type

  • Re: CO15
    Rajesh Sutar
    Currently Being Moderated

    Hi Kumaran,

     

    If you want automatic GR while confirmation then you need to use scheduling profile 00002 in material master or assigend control key to last operation in routing which has Auto GR tick mark

     

    Hope this help you.

  • Re: CO15
    Shivasharanappa Maddur
    Currently Being Moderated

    Hi Kumar,

     

    For FERT GR, we have two cases.

     

    1. With Manual GR, During confirmation we can't do GR (101 Mvmt) for Finish product. We have to do it in separate transaction either with MB31 or MIGO.

    2. If you want to do it automatically, the either set control key with auto GR in last opeation or configure in scheduling profile and assign to material master. Then when u confirm last operation, automatically GR happens for FERT.

     

    Shiva

    • Re: CO15
      kumaran k
      Currently Being Moderated

      Shiva,

       

      If you double ensure that in CO15, for FERT, no GR is permitted, I will close the thread.

       

      As you said, that it will not be possible for FERT, then what will be the case for HALB??

       

       

       

      thanks & regards,

      k.Kumar.

      • Re: CO15
        Mangesh S
        Currently Being Moderated

        Kumaran,

         

        For GI of components with order confirmations either you need to specify the backflush indicator against the components in the component overview.

         

        For FG to have auto GR either assign the control key with auto GR indicator tick to the last operation in the order or maintain the production scheduling profile with auto GR ticked.

         

        Even if the material is FG or HALB, when the production order is created for any FG or SFG (HALB) you can have auto GR for both the material irrespective it is FERT or HALB.

         

        Hope this helps you.

         