We are planning to upgrade SAP R/3 4.7 to ECC 6.0 for one of our customer. Can any one please explaing what are the upgrade steps from Technical Upgrade perspective.

Thanks

LK

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello,

You can find some docs regarding Upgrade to SAP ERP. Follow:

Upgrading to SAP ERP - Frequently Asked Questions

http://sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/80ab2ff5-d008-2b10-aabc-e3ba181f9d38

Getting Started with an Upgrade to SAP ERP 6.0

http://sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e05ed6c7-c608-2b10-e0b9-95d2111c0b0a

SAP Technical Upgrade Project

http://sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/70bd6e80-7a2d-2c10-bd96-8cf43f2460b1

Well, in SDN you can find a lot of docs too...

I've passed to a Technical Upgrade (4.6C to 6.0), if you need other material or share experience... contact me...

Regards,

Diogo Carvalho

Abuzar
Explorer
0 Kudos

Hi, I am planning to migrate hardware and upgrade to EHP4 from ECC 6.0

i want to know the procedure for emergency transports in case of requirement.

what will be the plan and procedure for transports.

Thanks.

Former Member
0 Kudos

null

Edited by: ashwin.mane on Aug 16, 2011 1:16 PM

Edited by: ashwin.mane on Aug 16, 2011 1:16 PM

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Following are the upgrade steps:

1.System preparation and stack level patch upgrade . Basis Team

2. SPDD Phase . ABAP and Functionals

3.Up gradation of the system . Basis Team

4.SPAU Phase . ABAP and Functionals

5.DBACOCKPIT for indexing . ABAP TEAM

6.Issue resolution and error tracking . ABAP and Functionals

7.Z programs corrections . obsolete function modules and objects

The Points to be remembered during an upgrade

. Before we start the up gradation project, during the pre upgrade study, We need to find out weather

there is any customer specific development done by SAP in the previous system (4.6c). If so, the

time to act is just after the pre upgrade study only. The customer would only want to retain the

customer specific module developed by SAP.

We need to get SAPfs intervention in the project before we start the upgrade. SAP would develop certain patches to be run on the previous system (4.6c) to capture all the customer specific development and then they would run some patches on ECC system . this would release the customer specific development in the new system (ECC). This is a very crucial and important check of the step. If not taken care of at the proper time, it might hamper the Customer Specific development on the new system.

. It is to be assured that the new system is at the latest stack level for ABAP, XI, BI etc before we start

the SPDD and SPAU phase

. Only one request is to be made for SPDD. For SPAU too, only one request should be made.

. Previous system sandbox (4.6c) should be available for reference during the entire upgrade project

and should not be scrapped before the Go Live.

Hope it will useful.

Thanks

Hemant

Former Member
0 Kudos

Hi Tycondo,

See below major activities involved in Technical Upgrade perspective.

1. System preparation and stack level upgrade

2. SPDD Adjustments (Shadow System)

3. Complete system Upgrade to ECC 6.0

4. SPAU Adjustments (Upgraded System ECC 6.0)

5. ABAP Remediation - custom code fixes due to Upgrade

6. Functional Integration Testing

7. UAT

8. Cut-Over

Hope, the information may helps you.

Regards

Ravi

sunny_pahuja2
Active Contributor
0 Kudos

Hi,

please go through http://service.sap.com/ehp-erp...And go thorugh master guide then you will get the feel how you can plan your upgrade...

If in that you will face some problem..then please tell me here...

Thanks

Sunny