on 08-13-2009 10:03 AM
Hi,
I have activated planning change log in system. Its capturing details for change date, ID used and amount which has been changed.
There is a column in CJI4 called "Time Created" but its not showing value in time format, some other numeric figures are appearing.
I suppose its to capture time of plan change, can some body guide me on this.
Thanks with Regards
Saptak
Time created is the time that the database record was saved (seconds since 1.1.1990 0:00 Uhr Greenwich Meantime multiplied by 10000).
See if field 'Time of Entry' is relevant for your use.
Regards
Sreenivas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.