Hi Gurus,
I created an BOM alternative 1 using material XXXXXXXX back in May then last week i created a new BOM alternative 2 using the same material XXXXXXXX with additional components. However , I flagged alternative 1 for deletion.
When i tried to run the costing for this material i was unable to and got a message stating that there are three possibilities i need to check on
in the BOM header
1. the validity period
2. The Lot size range
3. The Bill of Material status
When I check the first two options given both the validity period & lot size looked good. When i checked Bill of Material status - even though i had alternative 1 flagged for deletion it was still active. So i changed the status from active to inactive and the costing run worked.
However, this does not make sense to me because you can have more than 1 alternative BOM's active at one time. When i was running the costing run i precisely choose which BOM alternative i want to cost.
Please can someone help me understand why this may have happened?
Best Regards,
Noopers
I still dunno what really caused it but i removed the active flag and made the first BOM inactive.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.