on 09-17-2009 5:49 AM
Hi Experts,
I have one issue in material reservations. In unrestricted stock material is 100kgs. One department reserved material in last month for 70Qty.. Another department reserved the same material today for 50qty. Stores issued material against new reservation. Now for the last month reservation stock is defisit of 30qty. Now they are questioning that material issue should be done first reservation first out. How can we do that?
Regards,
Rajeswari
Hi,
Use transaction code OMCQ and change the message number M7181 from a warning message to an error message
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rajeshwari,
Whenever u create a reservation "Movement allowed indicator" is automatically set provided u set this in Config under below path:
SproMMInventory Management and Physical Inventory--Plant Parameters ( U can check it against ur Plant )
So if u remove this u can control ur reservation movemensts date wise.
Later u need to set the Movement allowed indicator for a particular Reservation via MBVR TCode as per required date.
Regards
Ramesh Ch
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
For that u have to set Dynamic Availability Check in transaction code OMB1 for the movement type.
Select B for any movement type and then try.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In standard SAP this not possible to do the goods issue on first come first out.
You can stop creating reservation, if stock is not there or the stock is already resrved.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
"You can stop creating reservation, if stock is not there or the stock is already resrved"
If stock is already reserved - Can we stop the creating reservations? I have changed the message control for M7181 as Error, but still at the time of creating reservations it is showing as warning only.
Regards,
Rajeswari
Can u please tell me, what warning message you are getting.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sir,
This is only the waring message I am getting.
On the 17.09.2009, only 0 G available
When the system carried out the dynamic availability check, it determined that not the total quantity will be available on the requirement date.
System response
Depending on how the system is set, this message is either a warning or an error message.
Procedure
If this message is a warning, you are able to post the document. However, please note that you may cause a backlog.
If this message is an error message, you have to reduce the available quantity in order to be able to post the document.
Display stock/requirements list
If I ignore this , system is allowing me to complete the goods Issue.
Regards,
Rajeswari
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.