Tables TCURM and T001W inconsistent; notify your systems administrator

Former Member
0 Kudos

Hi,

I am extending one material from one plant to another newly created (copied from existing plant) plant, while filling organizational data I am getting an error Tables TCURM and T001W inconsistent; notify your system administrator.

Message no. M3820

Diagnosis

Valuation is at plant level. However, inconsistencies have arisen because of the way in which the plant was configured in Customizing or because plants have not been assigned to a company code.

Procedure

Contact your system administrator.

Procedure for systems administrators

1. Check the assignment of plants to company code.

Proceed

2. Check the configuration of the valuation level.

Proceed

3. If the assignments are correct, check the entries in table T001W.

Proceed

Secondly in Account Determination Without Wizard, in second node Group together valuation areas I found that the valuation area and valuation grouping code is missing.

What could have went wrong?

-Saleel Kulkarni

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hello,

You need to allocation of plant to compnay code via customizing

Please chcek the OSS note 3128 and implement the correction.

Note 3128 says :

If valuation is on plant level (valuation level = 1 is agreed in TCURM), the plant itself must be stored as a valuation area for

every plant in the table T001W. This is ensured automatically if every plant was allocated to a company code via the configuration menu. It is not the case if, for example, the plant was created again but no allocation was made to a

company code

- the tables T001W/T001K were maintained directly via SM31, instead of via the corresponding configuration functions and

hence consistency was not ensured

Solution:

During valuation on plant level, the plant itself must be entered as a valuation area in the table T001W for every plant.

Procedure: Carry out Plant -> Company code allocation via Customizing

Also try to implement OSS note 137601 which is program correction along with Abaper.

Br,

Tushar

Edited by: Tushar Patankar on Jan 24, 2011 4:29 PM

Former Member
0 Kudos

Hi,

Please try OX18 T - Code and Assign the Plant and Company code.

Thanks,

Giri

former_member182609
Active Contributor
0 Kudos

Have you assigned plant to to company code

SPRO>Enterprise Structure>Assignment-->Assign plant to company code

Also assign Account Determination Without Wizard, in second node Group together valuation areas then try