on 12-21-2009 8:03 AM
Hi experts,
I was converting a planned order to production order in the MD04 screen and the system displayed the following error:
No task list for select.ID 01 for auto. task list selection found
Message no. CP010
Diagnosis
During routing selection, the system searches for the selection criteria entered in Customizing for the selection ID. However, no corresponding routing was found.
Although there is a routing system does not pick up the available one.Is there any routing selection criteria to be maintained in the customising so that this error does not rise.
regards,
Shanmugam
Hi,
Thanks for the replies.
In OPPQ, BOM,Routing select ID =01
In OPEB, ID=01, Task list type=N
In OPL8, Routing selection =6 (mandatory selection, automatic) and Task list type =N. Please tell me if routing selection =6, this error may occur.
regards,
Shanmugam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Everybody,
i need to introduce a custom (user exit or other) to drive the routing selection among alternative routing at the moment of planned order conversion into production order. I need to have this functionality both for individual that massive conversion.
Could you suggest me if there is an exit or a badi to do this. The customizing parameters are not enough for my requirements.
Thanks a lot
Ugo
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Issue resolved,thanks to all the contributors.
regards,
Shanmugam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Shamugham,
In my understanding I guess ther was no routing copied to the planned order itself during MRP run(Lead Time Scheduling),so
kindly check what routing selection ID is assigned in OPPQ for the particular plant.
So for this selection ID,check in OPEB for that selection ID to which task list type the first priority is set,If it is set for N - then it
means the system searches for a normal routing and likewise it goes for the next priority.
So after checking this setting re-run MRP,and ensure the system does not shows any exception message for 61 or 62.
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Shanmugam,
1) Go to OPL8, for ur plant & order type combination
2) check for option Routing selection make it as 3 & tak list type as N
3) check the dates of Routing
4) Run MRP with parameter 3 - delete & re-create planning data
5) then convert plan order to production order
Regards
Madhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Go to transaction code OPEB and check the setting for
selection ID Priority Task list type Plan usage DESrp Status
01 1 N 1 Prod 4
Check and revert back.
Regards
Atul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
Check in OPPQ plant parameters for the BOM?Routing selction id and also in OPL8 for the order type dependent parameters for your order type under the routing tab and selection id
Also Check whether the routing for the material is maintained and also check the valid from date of routing
Check and revert
Regards
Anupam Sharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.