hi all

 

Can anybody expalin me about the real time experience about BBP preparation.

 

Expalin me in real time how this phase willbe done for any client .??

 

What are the details and how ,wht basis BBP should be prepared ??

 

What are aspects will be covered in BBP??

 

How it be prepared  like , business process wise or tranaction wise , or in single shot in single document ..????

 

 

Exaplain me detailed manner in real time

 

 

Thanks

SAP-MM

  • Re: BBP in implementation???
    lakshmi C K reddy
    Currently Being Moderated

    Hi here is some useful,

     

    BBP document captures in detail the steps required to configure the SAP system to meet the business requirements as envisaged in the Conceptual Design Stage. The configuration steps will have mappings to corresponding menu path to where the configuration has been done in the IMG (Implementation Guide).  The rationale of all configurations is also provided.

     

    The documentation provides visibility to all project teams members on the proposed system settings and changes.  This is very important due to the highly integrated nature of SAP. This document is the base system specifications. All future changes or updates to the system should be done based on this and the documentation updated accordingly

     

    lakshmi reddy

  • Re: BBP in implementation???
    Malik Malik
    Currently Being Moderated

    Hi,

     

    BBP is called as Business Blue Prints.

     

    After AS-IS, BBP is Done.

     

    Is part of SAP , ASAP implementation part.

     

    Go to this Link

     

    http://www.sap-basis-abap.com/sapgeneral/what-is-asap.htm

     

     

     

    Regards,

     

     

    Pardeep Malik

  • Re: BBP in implementation???
    Chandra Shekhar Singh
    Currently Being Moderated

    Hi,

     

    BBP Phase starts after As is stage is over. in BBP you have to map the AS is Processes and it tells that how the As is processes shall run in SAP, it also includes the Org Stucture and nomenclatures that shall be used.

     

    in a nut shell you can say that its a document in which you have to capture the Legacy business processes as per the SAP Business processes, this forms the base of implementation as all the processes and org stuctures are customized as per the BBP.

    • Re: BBP in implementation???
      MM team
      Currently Being Moderated

      hi

       

      Can any body tel me , on what bases the BBP has to be prepared .?

       

      How it should ..?

      What are dtails it should contain..??

       

      Explain with some example with content ..??

      • Re: BBP in implementation???
        MM team
        Currently Being Moderated

        anybody is there with BBP real time experience experts in MM.

         

        Givem some inputs ..

      • Re: BBP in implementation???
        Anand Sharma
        Currently Being Moderated

        Hi,

         

        Can any body tel me , on what bases the BBP has to be prepared .?

         

        To prepare the BBP, consultant should have the bussiness knowledge and he will study the How the bussiness is running at present and what are other expectation (process wise), and this has to be aligned with the SAP.

         

        How it should ..?

         

        First consultant will do the AS is study, and collect all the requirement and consolidate all the process and it will be drafted as per the template.

         

         

        What are dtails it should contain..??

         

        Bussiness process.

        Flow chart

        Authorisation chart .. etc.,

         

        Thanks & Regards

        Anand

        • Re: BBP in implementation???
          MM team
          Currently Being Moderated

          hi thanks for response anand

           

          ya gud solution ,

           

          And what about the content of BBP in detailed manner .

           

          How means , BBP will be prepared in one docuemnt or business process wise or how we should propare to get a approval from client top management ???

           

           

          Provide me in detailed manner with some example ..

          • Re: BBP in implementation???
            MM team
            Currently Being Moderated

            Any inputs

          • Re: BBP in implementation???
            Malik Malik
            Currently Being Moderated

            HI,

             

            For Every Process, there is a separate BBP Document. That is dully singed by the process Owner(Client Side) and the consultant.

             

            Suppose BBP of Material Master:-

             

            Enterprise Area: Manage Procurement & Inventory

            Scenario: Master data

            Process Group: Material Master

             

            There should be version for Each Document.

             

            Now In material Master BBP should be conatain

             

            1. Material Type

            2. Number Range

            3.Material Group

            4. Purchasing Group   etc.

             

            Also contain integration with other module

             

            With FI/CO : Valuation Class, Profit Centre, Valuation type

            With PP : MRP type, Lot size, Schedule margin key, availability check

            With PM : Serial no. profile

             

            Flow charts

             

            And Configuration part

             

            Material Types

            Material Groups

            MRP Controllers

            MRP Types

            Valuation Class

            Purchasing groups

             

             

             

            Hope Clear U !

             

             

             

            Regards,

             

            Pardeep malik