cancel
Showing results for 
Search instead for 
Did you mean: 

how to carry out the following two steps for edit-phrase-set to charracter

Former Member
0 Kudos

hi,

how to carry out the following two steps.

1) Create a value assignment type with type u201CAu201D Node with class with all the tick marks for activate indicator a

2) Run Table based value assignment creation make sure the check edit is ticked ok

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Dear,

For first Query:

1) Create a value assignment type with type u201CAu201D Node with class with all the tick marks for activate indicator a

Path: SPRO>>Environment, Health and Safety >> Basic Data and Tools >> Specification management >> Specification Data Base Structure >> Settings for value Assignment >> Specify value Assignment Types.

Here you will find total value assignment Types available in the system.

Double click on the value assignemnt type, which you would like to change.

In this screen you need to select the value ass. Category as "A". after selecting the category "A" you need to enter the class in the column class(valAss.). Select the last 2 check boxes (New VA Active & Change Active) out of six.

If you want to create a new one go to "new entries" and follow the steps mentioned above.

For second Query:

2) Run Table based value assignment creation make sure the check edit is ticked ok

Once the updations or changes happened in the value assignments, you need to do this activity.

Path: SPRO>>Environment, Health and Safety >> Basic Data and Tools >> Specification management >> Specification Data Base Structure >> Settings for value Assignment >> Set Up Table-Based Value Assignment

Here you will find 2 rows

1. Create Entries for the Value Assignments

2. Set Up Table-Based Value Assignment

You need to select "Create Entries for the Value Assignments" first

double click on this. You will find a execution button. execute it.

system asks "Do you really want to change value assignment type entries?"

click on "Yes".

system updates the information in the value assignment tables, what ever you did the updates in value assignment types.

you will find the message of "number of new entries and number of entries deleted"

Go back...........you will find the activity performed tick mark.

you have to do the same thing in the second line "Set Up Table-Based Value Assignment". Here execution is not required.

Kamal