overall relese for PR

Former Member
0 Kudos

Hi,

Following setting has done for the PR release

1.overall relase for doc type

2. Overall relase for Release group

And all setting has done in set up procedure and system shows that no error re requisns. w. overall release but while creating PR Release strategy is not triggering

Is there any setting has to maintain?

Regards,

Renuga.A

Accepted Solutions (0)

Answers (6)

Answers (6)

former_member210560
Active Contributor
0 Kudos

Dear Renuga,

Please kindly check if user exit EXIT_SAPLEBND_001 have been exit in your system via transaction CMOD.If it had been

active, please kindly deactivate and retest.

Best Regards,

Ian Wong Loke Foong

Former Member
0 Kudos

Relese procedure is main depend on the Characterstics &Class.

can u re check the price value also. most of the time s give problem in price.

when u enter price with space and gretan than symbol ext.....

    • Relese procedure u cant Transport DEVELOP 100 to PRODUCTION.

u need to create again directly in Production.

Regards,

Anthyodaya.

Former Member
0 Kudos

Hi,

the plant information is on item level in the PR.

During the overall release, the system takes into account only

the characteristics that are identical for all items.

If, for example, item 10 of a purchase requisition contains

plant 001 and item 20 contains plant 002, the

plant is set to BLANK for the strategy determination.

Please check the FAQ notes 365604 and 493900.

Regards,

Edit

Former Member
0 Kudos

Hi

Log out once fand re loging once again and try. earlier this has worked in my case.

SAS

Former Member
0 Kudos

Release procedure also depends on how you are maintaing characterstics.

may be net order value, plant, purchase organisation, doucment type etc

If you are maintaing one or more than one characterstics then all charecterstics should be satisfied. Other wise release strategy will not trigger. please check your settings once

for second one maintain charecterstic for required document type

Former Member
0 Kudos

Hi,

i have maintined the characterstic for plant and document type only but release is not triggering to the PR docuument.

Regards,

Renuga.A

Former Member
0 Kudos

Hi mate,

Please check the values given for the plant and document type in the characteristics. Please check the characteristic and class entries you have given.

Former Member
0 Kudos

Hi

Please check your Value assignments in classification inside rel. stg details , For each stg you have defined the corressponding values must also be there as an mpty field stops triggering the stg during PR creation.

Regards

Former Member
0 Kudos

Hi,

i have checked all settings but still the relese statergy is not triggering .

Regards,

Renuga.A

harishsarathy29
Active Participant
0 Kudos

Hi,

Check the document type of the PR. The Overall release of PR indicator should be checked.

If that is done, try to delete the strategy defined and recreate again.

Harish

kunal_ingale
Active Contributor
0 Kudos

hi

check the class u have defined alongwith the charecteristics

http://www.sapstudymaterials.com/2008/08/purchase-requisition-pr-release.html

regards

kunal