on 04-13-2010 9:24 AM
Dear Gurus,
I have problem with spool request. I have scheduled BG job for every day period and thist job generate spool.
This job is writing values to the same spool number every day for a mounth. This work correctly for seven days
In eighth day the same spool number was attached to this job, but values in this spool were from another job. And every jobs which were created in last with this spool number have incorrect values of spool too.
It looks like this spool was rewrite by another job. I don´t know ho to prevent it.
Regards
Jakub Vaněk
We met a similar problem.
Perhaps SAP Note 1174127 - Job refers to incorrect spool request
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thats very weird... so when you open the spool attached to the job it shows the result of a spool created by a different job with the same number?
Check the spool number range maybe?... Also check for consistency in TEMSE
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
24 | |
11 | |
9 | |
7 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.