on 04-23-2010 11:50 AM
Business scenario:
When working with batches (we only have separate evaluation active, but in this case SAP standard uses batch=separate evaluation... mcha and mchb tables), I can only post the first goods movement when table mchb has an entry, this is ussualy done at the time of the first goods receipt...
I want to start goods movements (goods issue) for this new material/evaluation/st location before the first goods receipt... so I've set up the negative stock option in customizing and material master... althought it still issues the same message: M7 238.
I guess if we set up the negative stock option, then the first goods movement (an exit), should create the entry in mchb...
Any thoughts on this scenario?
Greets.
go IMG > MM > IM > Goods Issue / Transfer Postings > Create Storage Location Automatically
and make sure that you enabled 261 to create storage location automatically
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.