cancel
Showing results for 
Search instead for 
Did you mean: 

OME9

Former Member
0 Kudos

Gurus,

In OME9 for K ,in I 1D-Acct assignment i have given value 2 instead of 1.What is the impact if i give this value?

Edited by: acapulcosdn on May 25, 2010 8:29 AM

Accepted Solutions (1)

Accepted Solutions (1)

BijayKumarBarik
Active Contributor
0 Kudos

Hi,

You can post to two different G/L instead of one.

Regards,

Biju K

Former Member
0 Kudos

HI,

Even if we give 1 it will allow to post to different G/L account

BijayKumarBarik
Active Contributor
0 Kudos

Hi,

If one it will post one G/L.

For some bussinees requirement with one cost center needed to post different G/L. In this case, Cost elements (G/L) are created

& assigned to cost center( KA01/ KA02 t.codes)

Regards,

Biju K

Former Member
0 Kudos

Indicator: Account assignment screen

Indicates the standard account assignment screen used in account assignment maintenance for a purchase order item.

Procedure

If you enter 1, the dialog box for the account assignment of a single item will appear.

If you enter 2, the dialog box for the account assignment of several items will appear.

Former Member
0 Kudos

HI,

Sorry i was wrong,I have checked.

Answers (1)

Answers (1)

kunal_ingale
Active Contributor
0 Kudos

hi

if u have option 2 then u can have multiple assignmnet based on quantity and %

suppose u have item A with quantity 10

now u can assign 5 items for cost cenr X and 5 for CS Z

u have to create new line item with quantity 5

regards

kunal