SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Move IN and Move out Process

Former Member
0 Kudos

Dear All ,

Can any body tell me about the process of Move In and Move out from Business Master data to Technical Master data and Move In and Move Out . Install meter and Meter Reading in particular order For Example Following :

Correct me if i am wrong :

Move In :

1)Create BP bp

2)Create Contract account caa1

3) Create Connection object ES55

4) Create Premise ES60

5) Create Installation ES30

6) Create Device Location ES65

7) Install meter EG31

😎 Move in customer EC50E

9) Create MRO EL01

10) Enter read EL28

Move Out:

1) Create Periodic Meter read order/bill order EL01

2) Create move out EC55E

3) Verify periodic bill order suppressed ES31

4) Generate Final Bill EASIBI

5) Verify BP moved out ES31

Looking forward for any help, correct me if i missed any thing and kindlu also help me on Reconnection and Disconnection process as well.

Thanks

Khan

1 ACCEPTED SOLUTION

Former Member
0 Kudos

The order will be as below:

1)Create BP fpp1

2) Create Connection object ES55

3) Create Device Location ES65

4) Create Premise ES60

5) Create Installation ES30

6) Move in customer EC50E

7) Install meter EG31

😎 Create MRO EL01

9) Enter read EL28

In move in process u need not create a contract account, it will automatically be created in background when u move in.

In case of move out:

1) Create move out EC55E

2) Create Periodic Meter read order/bill order EL01

3) Verify periodic bill order suppressed ES31

4) Generate Final Bill EASIBI

5) Verify BP moved out ES31

View solution in original post

9 REPLIES 9

oliviawalsh
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello,

This all looks good however when the Move-in, Move-out process is execution a meter reading order is automatically created either with meter reading reason:

06 Meter reading at move-in

OR

03 Final meter reading at move-in/out.

It is not necessary to manually create the MRO via EL01 here.

It is also possible to create the business partner and contract account at the time of move-in.

You can find more information regarding this at the following link:

http://help.sap.com/saphelp_utilities472/helpdata/en/38/1a6c35a018d041e10000009b38f839/frameset.htm

In relation to the Reconnection and Disconnection process please see the following:

http://help.sap.com/saphelp_utilities472/helpdata/en/38/1a6c35a018d041e10000009b38f839/frameset.htm

I hope this is helpful for you.

Regards

Olivia

0 Kudos

Thanks for you help , but i need steps with trasaction code as i mentined on the top .

Regards.

oliviawalsh
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi

Can you elborate on what exactly you are looking for?

You have the transaction codes for Move-in/Out, you can also use EC70 for accelerated move in/out...

For disconnection / reconnection the transaction is EC85.

FIrst you generate the disconnection order and then enter the disconnection.

From here can then also implement reconnection....

Regards

Olivia

0 Kudos

Dear

I am looking for help thanks again you revert back on the reply , i need the process steps like for example ,

First we create BP that is business master than create Technical object ( connection object , premises, Installation , device location ) i donot know the sequence and donot know when to create the device and Install meter , at what time i should create the disconnection order and take the reading stuff like that .

Appreciate your help in this regards if u can tell me the right sequence of busnisee and technical master data with Full install meter and device creation or disconnection reconnection

Thanks

Cheers.

0 Kudos

The steps u have mentioned look fine.As mentioned earlier,MRO need not be created explicitly during move in/move out.Creation of device can be done using IQ01 and this device/serial no should be used during full installation(EG31).

Also,ES31 is change installation,u can verify BP has moved out by checking EL31 and seeing that the reading reason 03 exists.

Former Member
0 Kudos

The order will be as below:

1)Create BP fpp1

2) Create Connection object ES55

3) Create Device Location ES65

4) Create Premise ES60

5) Create Installation ES30

6) Move in customer EC50E

7) Install meter EG31

😎 Create MRO EL01

9) Enter read EL28

In move in process u need not create a contract account, it will automatically be created in background when u move in.

In case of move out:

1) Create move out EC55E

2) Create Periodic Meter read order/bill order EL01

3) Verify periodic bill order suppressed ES31

4) Generate Final Bill EASIBI

5) Verify BP moved out ES31

Former Member
0 Kudos

Disconnection can be done from EC85 and reconnection from EC86.

0 Kudos

Hi Is there any standard Odata service or BAPI/FM which can be used for Move In Proces and Move Out Process. Regards Ajay Singh Bisht

0 Kudos

BAPI_ISUMOVEIN_CREATEFROMDATA

BAPI_ISUMOVEOUT_CREATEFROMDATA