Change management

Former Member
0 Kudos

Dear all

I have a problem related with the change management in the EHS. I have run the job for the change management and iheritance, in CC01 i have created a change number type change master and assigned in the global parameters this change number with a key date. The problem is that i can't run in the extras--> change document log it is not posibel to select, but if i went to the transaction se38 and run the program RSSCD110 i can see that changes are being recorded.

What i am missing here?

Thanks

Armani

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Armani,

If you are accessing the substance from substance navigation menu on the left part of the screen, then right click to get change log option active. Else, search the specification from hit list and then go to "Extras" for change document log; the same should be active now.

Regards,

Pavan