I'm working with Sap for mill products. When a try to settle a production order that contains coproducts I get the following error:
MILL_UA044 Material price for order 2000128 material 103400 could not be determined.
However I have already calculated and released the cost estimates for these materials and I was even able to calculate variances without getting errors.
Plese if someone can help me as soon as possible i would aprecciate it!
thanks a lot
Fernanda
Hi
Did you run CO8A / CO8B before calculating variances??
br, Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi .
Check if the Material Document is Posted for the Mateial by Updating Order. This could b the reason for tht Error.
Thanks
Goutam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.