on 11-15-2010 5:24 AM
Hi Experts,
In MTO scenario, creation of production order is based on sales order. While doing GRN it is going to sales order stock. Is there anyway to post directly to the unrestricted usage?
For this what are the prerequisities?
Anybody plz help me?
Naren
Answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As per my thinking, it is not possible in standard SAP, as your production is against the
sales order. If you want to post the stock order stock in the unrestricted stock, you can do it
by stock transfer within location using t-code:MB1B, here select the movement type 411E and
maitain the sales order and its order qty and save, your sales order stock will be moved to
unrestricted stock.
Please check and revert.
Thanks,
Hrishi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Im not clear on why you want to post th stock to unrestricted.
IN MTO,goods are manufactured for a particular customer and the planning copies the requirements from sales order.
Once the processing is completed,the goods are picked from sales order stock for completing the delivery and billing.
Here if reqired you can transfer the stock to unresticted manually after the GRN is posted.
This can be done in MIGO,transfer posting using the movement type 413.By doing this the requirement of the sales order will not be closed and it will be available for planning.
Regards,
Joseph Charles Vaikathussery
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for your reply.
Actually my scenario is Make to stock also. PIR with characteristics planning is not possible in Standard SAP. I tried and i didnt get. So, i'm planning to create CIR. So, with that CIR we can post stock into Sales order stock. After GR i need to transfer. Is there anyway to post directly to Unrestricted.
Exact planning of characteristics wise will be done with APO.
Naren
Hi Narendra
If you have maintained dependent requirement as Individual (1) or collective (2) in material master (MRP 4). After MRP run, if material is having individual requirement then PR and PO of such material will contain account assignment as M (Ind. cust. w/o KD-CO).
If u remove this account assignment then after making GRIN stock will be posted directly as unrestricted stock but note that by doing this in next MRP run system will again generate PR for that account assignment.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.