EK02 calculation

Maddy Boy
Currently Being Moderated

Dear Frnds,

                   Need your assistance. I am in support and there is ticket as per which the cust wants to understand how EK02 is calculated where and how the values are being fetched .

                   I have read quite a few of the posts through google but none of them give an explanation as to where or how the calculation is done.

                   The condition type is assigned in  the document type.

 

PLease assist

 

Regards

maddy

  • Re: EK02 calculation
    G Lakshmipathi
    Currently Being Moderated

    Check this link

     

    [Sales Order Costing in Pricing |http://help.sap.com/saphelp_47x200/helpdata/en/93/7434eb546011d1a7020000e829fd11/frameset.htm]

     

    thanks

    G. Lakshmipathi

  • Re: EK02 calculation
    Glynn Williams
    Currently Being Moderated

    Hi Maddy,

     

    Generally EK02 is calculated in the billing document after the goods issue.

     

    According to the standard functions, the planned value of the production order is transferred to the sales order in controlling area currency. After the translation, this value is written into condition EK02 in company code currency.

     

    There is a great note on general costs - Note 547570

    Also refer to Note 713379 - FAQ: EK02 in assembly order

     

    All the best,

     

    Glynn

    • Re: EK02 calculation
      Maddy Boy
      Currently Being Moderated

      it is a made to order scenario ..........product costing..thnks for the response Glynn and Lakshmipathi

       

      Regards

      Madan

       

      Edited by: Maddy on Dec 20, 2010 2:52 PM

      • Re: EK02 calculation
        Maddy Boy
        Currently Being Moderated

        Dear Frnds I am still not able to figure out how the cost is picked in sales order.(EK02).......The production order value and the sales order value differs by an average of 200 USD .

         

        I have read in the forum that the costing set up is done in the Requirement class/type. but when i check the setup the costing area here is blank(example ID and all the other options have not been entered).

         

        Cost includes material cost, overhead cost and labour costs plus administrative cost............the former is calculated in production order .....i cant figure out where and how the latter is computed....is it from the cost sheet????

         

        Please assist

         

        Regards

        maddy