HI All,

I have created Schduling Agreement, maintained Source List with MRP Relevant - 2 option and maintained Vendor as Fix, maintained info record.

I have created a material with MRP type as PD and lot size as EX, and strategy group as MTS. Now when i enter requirement through MD61 and do MRP Run through MD02, system is generating PR instead of Del Schdule line inspite of schduling agreement.

But If i change MRP type to VB and maintain reorder point and maintain min lot size, then system generates Del Schdule lines for the same material.

What could be the reason. I want delivery schedules based on MRP Type PD.

Where I am wrong in MRP Views or in any cutomization. It seems that purchasing part is fine since it creats scudles line so no problem in SA or in Source List.

Please help

Regards,

Vikas

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member1327331
Participant
0 Kudos

In MD02 screen, for the field "Delivery schedules", select the option as 3 and then try.

Former Member
0 Kudos