on 01-17-2011 4:12 PM
Hi
gurus i have two line item in GRN in which two also come under inspection lot one is OK (321 mvt ok) and one line item is reversed (122 mvt) , now i want to reverse the 122 mvt (123) through quality method , But i tried through MB1B and mbst
but i could not do it since ud has been done
please help me
Regards
Leo Thilak.MS
System executive
TVS
Hi,
It is not possible when ur QM module active in system..
Pl make fresh GR against PO for balance QTY.
OR follow the below steps-
1) Create own report program refer to source code which is attached in SAP note 175842.
(The object name is 'RQEVAC50'.)
2) assign the transaction 'QA11' as allowed transaction into movement type '123' at transaction OMJJ.
(This is configuration.)
3) Execute above program and input the inspection lot number then execute.
(Stock which was transferred from QI to other will be reversed to QI stock again.)
4) Post stock again at transaction QA11 or QA12.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.