We are doing ck40n and try to release the cost estimate. But error CK711 Future standard cost estimate is locked for this company code B.

We have another company code A already completed cost estimate. But we found some materials cannot be release and Future Cost in Materail master. Also said no authorization on company C, and D which is totally not related.

Can anyone give me some hints ?

Thanks a lot

Accepted Solutions (0)

Answers (2)

Answers (2)

ajaycwa1981
Active Contributor
0 Kudos

Hi

Go to CK24 and check if marking allowance is issued for the required company codes

In Ck40N, i hope you have specified Plant in Selection parameters.. Else, it would not give error for any unrelated comp code

br Ajay M

former_member588855
Active Contributor
0 Kudos

Check two things.

1>There is no authorization issue while releasing.

2>Secondly for those materials for which future costs exists delete the same through CKR1.