on 10-17-2011 1:43 PM
HI,
Can you give me some help on setting up a rework process for process manufacture factory?I don't see some function in PI factory, like reference operation set (trigger point)in discret manufacture factory....I don't know how to make it...thanks..
Hi,
Open routing and select the operation line item
To assign the Trigger Point function press GOTO MENU and then select Trigger Point Overview
enter trigger point usage and description
Now select trigger point usage line item and click DETAILS menu and select "TRIGGER POINT"
Create Routing Trigger Point Details will appear
Select the check Box="Insert reference operation set"; Sys Status=PCNF; Active=1
now on the top Press the "PARAMETERS BUTTON" assign the group and group counter
come back to the operation overview and save
Regards,
Raj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear
Rework order process:
Create order through CORO.
Using CORO t-Code create production order with Order type=RW01.
In that select reference operation set enter group number and task list type=S
Mention the Main order Process ordernumber in the settlement profile of rework order.
Issue good if you want to isue any components
Confirm rework order
TECO the rework order
Now do GR of main process order.
With Regards
Pushpalas
Edited by: pushpalas on Oct 17, 2011 3:01 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,pushpalas and all of you:
thanks very much for your quick reply..
but I need a rework process for PI...I can't find a trigger point function in C201(reciept) to insert a reference operation set...can you tell me how to make it via process order(reciept,resource) instead of production order(router,work center)..
thanks..
HI,pushpalas and all of you:
> thanks very much for your quick reply..
>
> but I need a rework process for PI...I can't find a trigger point function in C201(reciept) to insert a reference operation set...can you tell me how to make it via process order(reciept,resource) instead of production order(router,work center)..
>
>
> thanks..
Hi,
The below mentioned process hold good for Discrete as well as Process manufacturing
Let it be normal routing or master recipe
Open routing and select the operation line item
To assign the Trigger Point function press GOTO MENU and then select Trigger Point Overview
enter trigger point usage and description
Now select trigger point usage line item and click DETAILS menu and select "TRIGGER POINT"
Create Routing Trigger Point Details will appear
Select the check Box="Insert reference operation set"; Sys Status=PCNF; Active=1
now on the top Press the "PARAMETERS BUTTON" assign the group and group counter
come back to the operation overview and save
Regards,
Raj
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.