Dear Friends,

Pl advise how to go for scale price in GR for Scheduling agreements:

GR Qty from 1 is rs.15/-

GR Qty from 1000 is rs.12/-

GR Qty 2000 is rs.10/-

How to go about it. What will be the configuration settings. What will be the accounting entries in GR and IV.

Pl let me advise the full procedure.

Note: I already refereed SAP NOTE- 401941,But it was 2003 version.So is their any standard settings are available in ECC6 to address this above issue ??

Regards

AKS

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Note is also valid for 600 release. see note in details

Valid releases

Software Component Release

from to

SAP_APPL

SAP Application

600 - 600

500 - 500

470 - 470

46C - 46C

46B - 46B

45B - 45B

40B - 40B

In standard, scale prices have been defined for a scheduling agreement

item. When a goods receipt is posted, the scale price applicable to

the target quantity of the scheduling agreement item is applied for

valuation purposes.

For schedule agreements the SAP standard is to use the target quantity

for price determination.

User exit EXIT_SAPLEINR_003 exists using which you can influence the

quantity and the date of the price determination at the time of the

goods receipt for the scheduling agreement. However, you need to bear in

mind that when you call up the user exit, the quantity of goods received

actually to be posted does not yet exist. The schedule lines are

available in internal table CETT which can be used.

In the standard system, the EXIT_SAPLEINR_003 is run when a goods

receipt is posted for the scheduling agreement or purchase order when

item has the pricing date (price category) = "5" (goods receipt date).

For scheduling agreement document type, pricing category is always 5 if

time dependent conditions are used for that document type.

BR

Nadia Orlandi

JL23
Active Contributor
0 Kudos

even the note is from 2003, at the bottom you can see the releases for which this note is valid, and release 600 is listed.

So it is still only possible to calculate the price based on the schedule line quantity and not on the entered GR quantity.

Former Member
0 Kudos

Dear Jurgen Sir,

I am absolutely agree with you.But my issue is if I maintained Schedule line 1000 qty for one particular date and do MIGO against to the SA,system is picking Rs.10 (for >2000 qty) instead of Rs.12.

I already maintained the scale inside the SA -> Item Condition ->Scale.

So kindly guide me is their any other setting is available to do so that system will take the exact value (Rs.12) instead of the lowest value (Rs.10) ??

Thanks and Regards

AKS

Former Member
0 Kudos

Hi,

If scale prices exist for a scheduling agreement item and you

post a goods receipt, the scale price applicable to the "target

quantity" of the scheduling agreement item is applied for valuation

purposes (and not the quantity posted at the time of goods receipt).

User exit EXIT_SAPLEINR_003 exists using which you can influence the

quantity and the date of the price determination at the time of the

goods receipt for the scheduling agreement. However, you need to bear

in mind that when you call up the user exit, the quantity of goods

received actually to be posted does not yet exist.

If you want that the quantity maintained in scheduling agreement

should be used for price determination, then this quantity is

there in ekpo-ktmng. Please use ekpo-ktmng and change the

quantity p_menge in user exit EXIT_SAPLEINR_003.

The schedule lines are available in internal table CETT

which can be used.

More information in note 401941 in connection with above.

Also, Quantity ordered to date can be specified ,see note 453655.

SE37:

EXIT_SAPLEINR_003-> Display

Goto-> documentation...

Adjustm. of Qty. and Date for Price Determination, GR Against Sched. A

I hope this is useful.

Regards,

Ashwini.