on 01-16-2012 1:21 PM
HI
Our EHP upgrade running on subjected phase;
We are very sure, it is very expensive phase in TIME,
But my concern is
in folder
<EHP ROOT FOLDER>I/abap/log
none of the logs file stamps are not moving from last 1 hour.
how the log files will be updated in this phase
any clues ??
Rgds
PR
Hi PR,
Look at /tmp, it should have some files written and updated.
Cheers,
Nicholas Chang
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks ...Nicholas Chang
Even /tmp contains same time on stamp on some which i see latest in /../abap/log folder
i connected SQL prompt and confirms , DB is active (not dead - not like not responding)
Thanks Aidan
on my my GUI Screens still it is showing as running, no Error is flashing, once it stops with similar error, i think now i have fix in my basket.
In oracle alert_log, we can see some redo log switching messages
Thanks to both of you, I am still trying to see, where else we can monitor this dum time ( like)
Rgds
PR
Hi Srinivas,
Generally the RDDMASGL job runs in the shadow system during the ACT_UPG phase. Please check if this job is active and running in the shadow system and also please check the status of the job to check if it is really running.
As the logs are not getting updated, I suspect the job will be in active phase and actually it is not running so check on the job status will correct this and the logs will be automatically updated.
If this information does not help you, please post the upgrade logs to check the issue further.
Thank You.
Regards,
Deepika
Hello.....Deepika & Nicholas Chang
your inputs really went well. When i treid to execute your given steps
The shadow system was locked.
We unlocked it form the below command
.../EHPI/abap/bin/SAPehpi unlockshd <SID>..
after unlocking, We logged into Shadow instance and found
RDDMASGL was running in SM37
We selected that job and in Menu --> Job->Check Status
it turned to Cancelled.
i.e as you said - The was not actually running.
after few minutes the new " RDDMASGL" job started
Now We are sticking to SM37 Screen - to checking in some frequency
and making sure to discover it is really ruuning or not.
as well, now i see some DIA & BGD WP's are running in SM50.
Now gives a confidence that it is running now and i am not running thru DUM time
I also kept watch on SQL promot, that DB does not go down for any panic or for any reason and making sure DB is responding.
Thanks once again to both of you , I will keep you posted on this once it moves to next step of from ACT_UPG and lamp this message as answered.
T H A N K ......Y O U..... V E R Y..... M U C H
Rgds
PR
The STEP was ended with error and was flashing to see a log - ACTUPG.ELG
and it was showing as
**************************************************
LIST OF ERRORS AND RETURN CODES *******
**************************************************
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
DDIC ACTIVATION ERRORS and RETURN CODE in SAPA-702DDINSAPBASIS.D10
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1EEDO519X"Table" "QMFE" could not be activated
1EEDO519 "Table" "USREXTID_IDM" could not be activated
1EEDO519 "View" "VIQMFEL" could not be activated
1EEDO519 "View" "VIQMFEL_IFLOS" could not be activated
1EEDO519 "View" "V_COCF_MD_CNF" could not be activated
1EEDO519 "Table" "/SAPNEA/MR3_ORDER_ITEM" could not be activated
1EEDO519 "Table" "ZTEST1" could not be activated
1 ETP111 exit code : "8"
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
unlocked shadow system, and given to login my ABAP Experts, they fixed above and finally Installation moved to next step
MAIN_SHDRUN/MAIN_RSPTBFIL_DEST ...step in pre processing phase.
Thanks to all
Closing this message as answered
Rgds
PR
Hi Deepika,
I also have the same issue , Job RDDMASGL is running from 30 hrs . I have checked the error logs but not found any thing useful. I have also check for memory issues. I have cancelled the job and again restarted the SUM again but still the same issue.
can you please help on this.
My platform is windows and oracle
Thanks,
Neel
Hi,
A general note that may help is:
[556764|http://service.sap.com/sap/support/notes/556764] Upgrade hangs in phase ACT_<REL>
Our recommendation is following note [1387739|http://service.sap.com/sap/support/notes/1387739].
Out of memory in ACT_UPG phase during EHP Installation.
Regards,
Aidan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.