cancel
Showing results for 
Search instead for 
Did you mean: 

failure for one step of process chain (red status-Ended with errror)

Former Member
0 Kudos

Hi Expert,

I am getting consistence failure for one step of process chain (red status-Ended with errors).

This step contains planning book macro run.

I am unable to get exact error massage. I have noted difference between successful chain and failed chain.

For failed chain

u2022 DROP VIEW "/BI0/*****"

u2022 SQL-END: 13.02.2012 ******

u2022 Job finished

For successful chain

u2022 DROP VIEW "/BI0/******"

u2022 SQL-END: 11.02.2012 ****

u2022 Entire chain now has status 'G'

u2022 Termination of chain has been reported to meta chain EBW159UXAASGVO2SHULZUQP7E

u2022 Job finished

You are requested to help me and suggested possible root cause for this failure

Edited by: Rushikesh Joshi on Feb 14, 2012 6:46 AM

You are requested to help me and suggested possible root cause for this failure

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Rushikesh

Are you implemented any Macros user exit If it is then Job fails due to locked issues.

check for lock/unlock issues.

Thanks

Chandra Kanth

former_member209769
Active Contributor
0 Kudos

Hi Rushikesh,

Seems lilke some BW related issue.

What does your macro do? I need names of involved BW (or DP) characteristics/KFs or cubes, etc. along with info on what kind of operation you are doing through the macro.

Thanks - Pawan