on 02-14-2012 5:43 AM
Hi Expert,
I am getting consistence failure for one step of process chain (red status-Ended with errors).
This step contains planning book macro run.
I am unable to get exact error massage. I have noted difference between successful chain and failed chain.
For failed chain
u2022 DROP VIEW "/BI0/*****"
u2022 SQL-END: 13.02.2012 ******
u2022 Job finished
For successful chain
u2022 DROP VIEW "/BI0/******"
u2022 SQL-END: 11.02.2012 ****
u2022 Entire chain now has status 'G'
u2022 Termination of chain has been reported to meta chain EBW159UXAASGVO2SHULZUQP7E
u2022 Job finished
You are requested to help me and suggested possible root cause for this failure
Edited by: Rushikesh Joshi on Feb 14, 2012 6:46 AM
You are requested to help me and suggested possible root cause for this failure
Hi Rushikesh
Are you implemented any Macros user exit If it is then Job fails due to locked issues.
check for lock/unlock issues.
Thanks
Chandra Kanth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rushikesh,
Seems lilke some BW related issue.
What does your macro do? I need names of involved BW (or DP) characteristics/KFs or cubes, etc. along with info on what kind of operation you are doing through the macro.
Thanks - Pawan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.