Production Confirmation cancellation issue

tanuj_parikh
Active Participant
0 Kudos

Dear All,

After Production Confirmation (101), stock is in QM and Insp Lot Status is REL. Still System is not allowing CO13 as well as CO11 with 102/262, saying "Change the inspection stock of <material> in QM only".

Inspection Type: 04, 05 is activated for both Produced Material (101) and consumed material (261). We tried by removing 05 inspection type for both Materials.

Above error message appeared for Producted Material (101).

Ideally, System should allow to cancel Production Confirmation when stock is in QM with REL status.

Request to guide what went wrong.

Regards,

Tanuj Parikh

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Dear Tanujbhai,

Please check below link,

[;

Regards,

Sandip

tanuj_parikh
Active Participant
0 Kudos

Thanx Sandip,

Given link is very much helpful. We have already applied that Note. Issue is solved now as per given solution.

Regards,

Former Member
0 Kudos

Dear Tanuj,

Try CORS for cancel confirmation of Order.

-Sandip

Former Member
0 Kudos

Hi,

Instead of doing 102 manually try to can cell the original material document which created the lot. (GR document).

Regards,

Smruti