Application Development Discussions
Join the discussions or start your own on all things application development, including tools and APIs, programming models, and keeping your skills sharp.
cancel
Showing results for 
Search instead for 
Did you mean: 

what is ECN number?

Former Member
0 Kudos

Hi,

What is ECN number? how to validate it?

I am working with a report ( MM module) the intial screen contains material, Plant cost of rework, and disposition..

I want to display a valid ECN number in header.

Please help me

3 REPLIES 3

Former Member
0 Kudos

Hi

Its exact full form is Engineering Change Number.

As far I can understand its the material code or material no along with the serial no is termed as Engineering Change Number.

And the report u have to make is to show the materials whose status is valid at the time is run.

Regards,

Mayank

PS: Reward points if the post is helpful

0 Kudos

Hi

Thanks for response..

Can U tell me where I can get this ECN information(table, fld).

How can I validate against material no and plant please explain.

thanks

0 Kudos

Hi Sri,

Engineering Change Number.

TABLE - AENR

FIELD - AENNR

<b>

DOCUMENTS_TO_CHANGE_NUMBER</b> - This Function module returns internal table within materials and documents for the <b>engineering change number</b> AENR-AENNR (just select * from the DRAW table).

check the links below for further information,

http://www.sap-img.com/pp007.htm

<b>http://help.sap.com/bp_blv1500/BL_US/HTML/Scenarios/V8P_Scen_EN_US.htm

Click Business Process Procedure and Process Flow Diagram

and download the document available in above link.

</b>