01-16-2007 8:55 AM
Hi,
What is ECN number? how to validate it?
I am working with a report ( MM module) the intial screen contains material, Plant cost of rework, and disposition..
I want to display a valid ECN number in header.
Please help me
01-16-2007 9:16 AM
Hi
Its exact full form is Engineering Change Number.
As far I can understand its the material code or material no along with the serial no is termed as Engineering Change Number.
And the report u have to make is to show the materials whose status is valid at the time is run.
Regards,
Mayank
PS: Reward points if the post is helpful
01-16-2007 11:52 AM
Hi
Thanks for response..
Can U tell me where I can get this ECN information(table, fld).
How can I validate against material no and plant please explain.
thanks
01-16-2007 12:05 PM
Hi Sri,
Engineering Change Number.
TABLE - AENR
FIELD - AENNR
<b>
DOCUMENTS_TO_CHANGE_NUMBER</b> - This Function module returns internal table within materials and documents for the <b>engineering change number</b> AENR-AENNR (just select * from the DRAW table).
check the links below for further information,
http://www.sap-img.com/pp007.htm
<b>http://help.sap.com/bp_blv1500/BL_US/HTML/Scenarios/V8P_Scen_EN_US.htm
Click Business Process Procedure and Process Flow Diagram
and download the document available in above link.
</b>